Mixed afforestation with native and non-native species in Argentina-I
Score Breakdown
Integrity
verified Additionality confirmed by the VVB (AENOR) using an investment test, per the monitoring report (2025-10-31).
missing No buffer pool percentage reported and reversal risk is not addressed in available documents; baseline reassessment timing not stated.
Transparency
verified Named VVB (AENOR) and a recent monitoring period is provided (2022-09-01 — 2023-11-16); multiple documents (PDD, monitoring report, validation, issuance) are in the record.
missing Key MRV numbers are missing from extracted records (verified vs claimed ERR, total ERR figures, usage monitoring method not stated).
Claim Safety
verified Project is marked not CORSIA-eligible (reduces one double-claim pathway) and uses a recognised VCS methodology (AR-ACM0003 v02.0).
missing Baseline is project-specific and leakage justification is contradictory (monitoring: deemed negligible; validation: not addressed), increasing over-crediting risk.
Documentation
verified Multiple evidence documents and 15 documents used; monitoring report dated 2025-10-31 is recent and extraction confidence is high.
missing Several important fields are not stated in the extracted record (buffer pool %, baseline reassessment date, grid EF, verified ERR), and validation/monitoring contradictions reduce reliability.
Detailed Analysis
Integrity
Additionality was confirmed by the independent verifier AENOR using an investment test as stated in the monitoring report (2025-10-31), which is a strong positive. However, the project uses a project-specific baseline (method AR-ACM0003) and there is no recorded baseline reassessment date. No buffer pool percentage is reported and reversal events are listed as not addressed, which weakens permanence and leakage safeguards. The absence of explicit leakage deductions and gaps on reversal handling reduce the integrity score.
Transparency
Transparency is bolstered by a named VVB, a clear monitoring period (2022-09-01 — 2023-11-16), and multiple documents in the dossier (PDD, monitoring report, validation, issuance). Extraction confidence is high. Nevertheless, key MRV outputs — like claimed vs verified emission removal totals, usage monitoring method, and buffer percentage — are not found in the extracted record, limiting independent review.
Claim Safety
The project is recorded as not CORSIA-eligible, which lowers double-claim risk on one axis, and the methodology is standardised under VCS. But reliance on a project-specific baseline and contradictory or missing leakage treatment (monitoring says leakage is negligible while a validation record indicates leakage was not addressed) raises over-crediting concerns. CCP status is not stated, which leaves some dual-claim risk unresolved.
Documentation
Documentation coverage is moderate: 15 documents used, evidence includes PDD, monitoring, validation and issuance, and extraction confidence is high. The monitoring report is recent (2025-10-31). However, several essential items are not present in the extracted facts (buffer pool percentage, baseline reassessment, core MRV figures). Contradictions between monitoring and validation reports about safeguards and leakage reduce the effective quality of the documentation.
Overall
I privileged the monitoring report (2025-10-31) for safeguards, FPIC, grievance mechanism and benefit-sharing because it is the most recent comprehensive monitoring document and explicitly documents those items; this improves social/safeguard scores. However, for leakage the validation record dated 2025-11-11 indicates leakage was not addressed and is later than the monitoring report; I privileged that validation finding for leakage because it is later and suggests a material gap. These contradictions reduce confidence and have been reflected by downgrading integrity and claim-safety. Overall the project scores in the mid-range: additionality is verified, but missing/contradictory permanence, leakage and MRV details limit higher scores.
Audit Analysis
Project shows a verified additionality test and named VVB, but key permanence and leakage treatments are missing or contradicted across documents. Documentation is reasonably complete and recent, but contradictions between the monitoring and validation reports reduce confidence and increase risk.
Project Description
Proponent: Cambium Earth S.L. Protocol categories: Agriculture Forestry and Other Land Use Protocols: AR-ACM0003 Estimated annual GHG reductions: 27594 tCO2e Region: Latin America Registration date: 2026-02-02
Red Flags
- Contradictory evidence about safeguards, FPIC and grievance mechanism between monitoring and validation reports.
- Leakage treatment is contradictory (monitoring says negligible; later validation indicates not addressed) and buffer/reversal handling is not documented.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 678 | 0 | 678 | |
| Total | 678 | 0 | 678 |
Cosa migliorerebbe questo punteggio
- Publish or extract missing MRV figures (claimed and verified emission removals, buffer pool percentage) in the monitoring report or registry.
- Resolve contradictions by publishing a reconciled statement or updated validation/verification that explicitly documents leakage treatment, FPIC, safeguards, grievance mechanism and benefit-sharing.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed
reversal handling unclear
contradictory / not addressed
project-specific baseline
contradicted in docs
CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →