Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Serbia Registry: RegisteredAMS-I.C

MK Group Energy Biogas Plant

VCS-3622 ↗

#66of 268 in Biogas#607of 1339 in Verra (VCS)#27of 115 in AMS-I.C

5.2/ 10
Integrity
6.0
Transparency
4.2
Claim Safety
5.2
Documentation
4.8

Audit Analysis

The MK Group Energy Biogas Plant is a VCS-registered biogas project in Serbia with a verified investment-test additionality and consistent ERR figures, but suffers from significant data gaps including missing feedstock sustainability verification, no carbon content testing, no end-use tracking, and a weak 0% leakage justification. Five forward action requests remain open, and contradictions between the PDD and validation report on FPIC and leakage treatment reduce confidence in the documentation record.

Red Flags

  • Five Forward Action Requests (FARs) remain open for future verification, indicating unresolved issues identified by the VVB
  • No feedstock sustainability assessment or carbon content testing found in any available document for a biogas project
  • Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis, which is weak for a biogas plant where methane slip is a known risk
  • No monitoring period, usage monitoring method, or end-use tracking data available to verify that generated electricity is actually consumed
  • Contradiction between PDD (FPIC not conducted) and validation report (FPIC conducted) creates uncertainty about community engagement

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test, VVB-verified

Permanence

Not AFOLU; no reversal risk

Leakage

0% deduction, weak justification

Baseline

Project-specific, no reassessment date

Safeguards

FPIC contradiction; grievance present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-I.C.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents