MK Group Energy Biogas Plant
#66of 268 in Biogas#607of 1339 in Verra (VCS)#27of 115 in AMS-I.C
Audit Analysis
The MK Group Energy Biogas Plant is a VCS-registered biogas project in Serbia with a verified investment-test additionality and consistent ERR figures, but suffers from significant data gaps including missing feedstock sustainability verification, no carbon content testing, no end-use tracking, and a weak 0% leakage justification. Five forward action requests remain open, and contradictions between the PDD and validation report on FPIC and leakage treatment reduce confidence in the documentation record.
Red Flags
- Five Forward Action Requests (FARs) remain open for future verification, indicating unresolved issues identified by the VVB
- No feedstock sustainability assessment or carbon content testing found in any available document for a biogas project
- Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis, which is weak for a biogas plant where methane slip is a known risk
- No monitoring period, usage monitoring method, or end-use tracking data available to verify that generated electricity is actually consumed
- Contradiction between PDD (FPIC not conducted) and validation report (FPIC conducted) creates uncertainty about community engagement
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test, VVB-verified
Not AFOLU; no reversal risk
0% deduction, weak justification
Project-specific, no reassessment date
FPIC contradiction; grievance present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →