Moelven Limtre, Moelv
#21of 352 in Biomass#1of 5 in Norway#4of 111 in Puro.earth (PUR)
Audit Analysis
Moelven Limtre is a Norwegian alternative-materials project (wooden building elements replacing concrete/steel) verified by DNV with a 10% buffer pool and no reported reversals or material findings. However, the project-specific baseline, absent leakage treatment, and CORSIA eligibility introduce moderate claim-safety and integrity risks. The ERR contradiction between the 2020 verification report (54,075 tCO₂e) and the 2022 issuance (20,822 tCO₂e) is most plausibly explained by different reporting periods, but the missing crediting-period length prevents a definitive pro-rata check.
Red Flags
- CORSIA eligibility is confirmed while CCP status is not stated, creating a dual-channel / double-claim risk
- Leakage deduction and justification are both absent from the extracted record despite the project type (displaced concrete/steel) where leakage is a recognised concern
- Crediting period is not stated in any available document, preventing a reliable pro-rata comparison of the 20,822 tCO₂e issued against the 54,075 tCO₂e lifetime estimate
- FNRB value, FNRB method, and usage-monitoring method are all not stated, limiting independent verification of the MRV chain
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 14,873 | 14,873 | 0 | |
| 2022 | 18,173 | 18,173 | 0 | |
| Total | 33,046 | 33,046 | 0 |
Risk Indicators
VVB-confirmed common-practice test
mixed evidence / unresolved risk
No deduction or justification stated
Project-specific; reassessment date not stated
Mentioned but FPIC and grievance mechanism not detailed
CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →