MRF wind power project in Tamilnadu managed by Enercon India Limited
#787of 1935 in Renewable energy#390of 975 in India#474of 1339 in Verra (VCS)#617of 1287 in ACM0002
Audit Analysis
A registered VCS wind power project in Tamil Nadu with a confirmed investment-test additionality and jurisdictional baseline, but plagued by recurring documentation and data-quality issues across multiple verification cycles. The low extraction confidence and numerous closed corrective actions (methodology version errors, meter calibration gaps, parameter omissions) undermine confidence in the MRV record despite the straightforward nature of the underlying technology.
Red Flags
- Low extraction confidence across 61 source documents, indicating at least one key document was poorly readable or incomplete
- Recurring methodology version errors (ACM0002 v10 cited instead of v17) and missing grid emission factor parameters (EFgrid,BM,y and EFgrid,OM,y) in monitoring reports across multiple verification cycles
- Meter calibration delays and a meter replacement due to RTC error identified as project deviations, with error factors applied to export/import values
- CCP status not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 24,791 | 24,791 | 0 | |
| 2007 | 26,218 | 26,218 | 0 | |
| 2008 | 27,438 | 27,438 | 0 | |
| 2009 | 29,199 | 29,199 | 0 | |
| 2010 | 28,075 | 28,075 | 0 | |
| 2011 | 26,837 | 26,837 | 0 | |
| 2012 | 29,640 | 29,640 | 0 | |
| 2013 | 18,869 | 18,869 | 0 | |
| 2014 | 30,293 | 30,293 | 0 | |
| 2015 | 489 | 489 | 0 | |
| 2016 | 24,030 | 24,030 | 0 | |
| 2017 | 25,394 | 25,394 | 0 | |
| 2018 | 41,896 | 41,896 | 0 | |
| 2020 | 21,564 | 21,564 | 0 | |
| 2021 | 22,427 | 22,427 | 0 | |
| 2022 | 17,631 | 3,823 | 13,808 | |
| Total | 394,791 | 380,983 | 13,808 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Deemed negligible, reasonable for wind
Jurisdictional, reassessed 2017, within 10-yr window
FPIC and grievance mechanism confirmed (2023 VR)
CORSIA not eligible, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →