#147of 295 in Turkey#415of 1339 in Verra (VCS)#553of 1287 in ACM0002
Audit Analysis
The Murat HEPP is a small hydro project with VVB-confirmed additionality and a jurisdictional grid-based baseline, but its integrity is undermined by multiple material findings (installed-capacity deviation of ~4.7%, generation-variability concerns, rounding errors in emission calculations, and an outdated VCS Standard reference). The project is conservative in its claims—using a lower 2024 grid emission factor and reporting lower actual capacity than the project description—but the absence of a stated buffer pool, unresolved contradictions across documents, and low extraction confidence limit confidence in the overall data quality.
Red Flags
- Installed power deviates from the project description: 37.22 MWe stated vs 35.478 MWe actual (~4.7% lower), flagged as a material finding in the verification report
- Multiple material findings on generation-variability, capacity inconsistencies, and non-conservative rounding in the ER sheet (CAR 01)
- Grid emission factor contradicts across documents: 0.44755 (PDD 2025) vs 0.65 (verification report 2023)
- Baseline method contradicts: 'jurisdictional' in the verification report vs 'project' in the original PDD (2013)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 5,895 | 5,895 | 0 | |
| 2013 | 106,907 | 106,907 | 0 | |
| 2014 | 48,959 | 48,959 | 0 | |
| 2015 | 110,283 | 110,283 | 0 | |
| 2016 | 35,299 | 35,299 | 0 | |
| 2017 | 59,670 | 59,670 | 0 | |
| 2018 | 72,389 | 72,389 | 0 | |
| 2019 | 116,685 | 102,758 | 13,927 | |
| 2020 | 90,392 | 50,000 | 40,392 | |
| Total | 646,479 | 592,160 | 54,319 |
Risk Indicators
VVB-confirmed investment test
low inherent risk (physical hydro)
Deemed negligible; standard for grid-displacement hydro
Jurisdictional grid-based; method contradicts across documents
FPIC conducted; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →