The Murat Hydroelectric Power Plant is a VCS-registered renewable energy project in Turkey with a VVB-confirmed investment additionality test and a jurisdictional baseline. The 2024 verification report shows claimed and verified ERR figures matching exactly (9,691 tCO₂e) for the 2020–2022 monitoring period, with no material findings. However, multiple contradictions between the 2015 validation report and 2024 monitoring/verification reports, a low extraction confidence rating, and the absence of a buffer pool or lifetime ex-ante ERR estimate limit confidence in the overall data reliability.
Red Flags
- Low extraction confidence across the document set, indicating at least one key document was poorly readable, reducing reliability of extracted figures
- Baseline method contradicts between the 2015 validation report (project-specific) and the 2024 monitoring report (jurisdictional); the more recent document is privileged but the discrepancy is unexplained
- One corrective action request (CAR) was raised in the 2024 verification cycle, indicating a minor compliance gap was identified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 7,667 | 0 | 7,667 | |
| Total | 7,667 | 0 | 7,667 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% with negligible justification
Jurisdictional but contradicted in 2015 report
Grievance present, FPIC not conducted
CORSIA excluded, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →