MUTLU 5 WPP
GS-151 ↗ · current registry ID: GS1242
#83of 295 in Turkey#166of 1801 in Gold Standard (GS)#292of 1287 in ACM0002
Audit Analysis
MUTLU 5 WPP is a Gold Standard wind energy project in Turkey with a confirmed combined additionality test and no reversal risk, but significant data inconsistencies between the monitoring and verification reports—particularly a large discrepancy in claimed emissions reductions—undermine confidence in the credit figures. The low extraction confidence across 21 documents further limits the reliability of the available evidence.
Red Flags
- Claimed emissions reductions differ by nearly 85,000 tCO2e between the monitoring report (97,793) and the verification report (180,173), with the verified figure (166,873) sitting between them—this unresolved discrepancy raises over-crediting concerns
- Baseline method is described as 'project' in the 2025 verification report but 'jurisdictional' in the 2020 monitoring report, creating ambiguity about the actual baseline construction for this ACM0002 wind project
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the structured data may not faithfully represent the source documents
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 74,274 | 0 | 74,274 | |
| 2022 | 92,599 | 0 | 92,599 | |
| Total | 166,873 | 0 | 166,873 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deduction, justification inconsistent across docs
Grid-EF based, method label contradicts across docs
Safeguards and grievance mechanism mentioned, FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →