Myanmar Kyeeonkyeewa Solar Power Plant Project
#450of 1935 in Renewable energy#2of 25 in Myanmar#230of 1339 in Verra (VCS)#338of 1287 in ACM0002
Audit Analysis
A solar PV project in Myanmar with a jurisdictional baseline and VVB-confirmed additionality, presenting low inherent risk for a well-understood renewable energy technology. However, the absence of any monitoring-period data, a low extraction confidence rating, and several procedural corrective actions limit the depth of verification possible. The project is fundamentally sound but the evidentiary record is thin.
Red Flags
- No monitoring-period data available; the only ERR figure (163,373 tCO₂e) is the ex-ante validated estimate with no independent verification to compare against
- Low extraction confidence across the document set, with two of nine documents classified as 'unknown' or 'other' type, undermining reliability of the extracted record
- Five corrective actions remain open, including justification of CDM tool applicability and correction of geographic coordinates, indicating the validation was not fully clean
- FPIC was not conducted, which is a gap for a project in Myanmar where community engagement expectations are high
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Solar PV – no reversal risk
0% deemed negligible, consistent with grid-connected PV
Jurisdictional grid EF (2016)
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →