5.9/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.5
Documentation
4.5

Audit Analysis

A solar PV project in Myanmar with a jurisdictional baseline and VVB-confirmed additionality, presenting low inherent risk for a well-understood renewable energy technology. However, the absence of any monitoring-period data, a low extraction confidence rating, and several procedural corrective actions limit the depth of verification possible. The project is fundamentally sound but the evidentiary record is thin.

Red Flags

  • No monitoring-period data available; the only ERR figure (163,373 tCO₂e) is the ex-ante validated estimate with no independent verification to compare against
  • Low extraction confidence across the document set, with two of nine documents classified as 'unknown' or 'other' type, undermining reliability of the extracted record
  • Five corrective actions remain open, including justification of CDM tool applicability and correction of geographic coordinates, indicating the validation was not fully clean
  • FPIC was not conducted, which is a gap for a project in Myanmar where community engagement expectations are high

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Solar PV – no reversal risk

Leakage

0% deemed negligible, consistent with grid-connected PV

Baseline

Jurisdictional grid EF (2016)

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents