Score Breakdown
Integrity
verified The validation/verification record indicates additionality was assessed via an investment test and confirmed by the VVB.
missing Leakage is not consistently treated (monitoring report does not address leakage; leakage deduction not evidenced), and the monitoring report lists corrective actions for missing monitoring parameters and meter calibration records.
Transparency
verified Key MRV elements are identifiable (methodology ACM0002, grid emission factor stated, monitoring period stated, VVB named).
missing Contradictory figures for verified ERs and multiple document inconsistencies reduce confidence in the public record and MRV clarity.
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk.
missing Over-crediting risk is elevated by contradictory ER totals and unclear leakage treatment; crediting-period inconsistency further complicates claims.
Documentation
verified A relatively complete document set is referenced (PDD, monitoring report, validation report, issuance) with high extraction confidence and 13 documents used.
missing The monitoring report includes several corrective actions (missing parameter reporting, unsubstantiated dates, and unclear calibration records), indicating documentation gaps in implementation evidence.
Detailed Analysis
Integrity
Additionality appears reasonably supported because the validation/verification record confirms an investment test and VVB confirmation. However, baseline setting is project-specific under ACM0002 and there is no clear evidence in the extracted record of when the baseline was last reassessed. Leakage is a key weakness: the monitoring report (2022) does not address leakage and no leakage deduction is evidenced, and the monitoring report lists corrective actions on missing monitoring parameters and meter calibration records, which undermines confidence in quantified ERs.
Transparency
The monitoring period (2012-09-01 to 2017-12-27), methodology (ACM0002 v06), grid emission factor (0.84335; year 2007), and VVB (Applus+) are clearly identified in the extracted record. No material findings are reported, but the monitoring report (2022) still requests clarifications and missing evidence, which reduces MRV transparency. A major transparency issue is the contradictory ER total reported across validation documents, which makes it difficult for third parties to reconcile what was actually verified/issued.
Claim Safety
The project is marked as not CORSIA-eligible, which lowers the risk of aviation-related double-claim pathways, though CCP status is not stated in the extracted record. Claim safety is weakened by the inconsistency in verified ER totals between validation reports and by unclear leakage treatment (quantified vs not addressed), both of which increase perceived over-crediting/greenwashing risk. The crediting-period inconsistency also creates ambiguity about which vintages and volumes are legitimately claimable under VCS.
Documentation
The extracted record references multiple core documents (PDD, monitoring report, validation report, issuance) and indicates high extraction confidence with 13 documents used, supporting a mid-to-strong documentation score. Nevertheless, the monitoring report (2022) lists corrective actions requiring missing parameter reporting, substantiation of implementation dates, and clarification/calibration records for backup meters. These items indicate that some underlying evidence was incomplete or not presented clearly at the time of assessment.
Overall
Overall quality is moderate: additionality is VVB-confirmed, but contradictions and MRV gaps materially reduce confidence. For leakage, the validation report (2022-09-02) indicates leakage was quantified while the monitoring report (2022-09-01) does not address it; the more methodology-focused validation report is privileged for intent, but the monitoring report is privileged for what was actually applied during monitoring, so scores are reduced due to inconsistency and lack of a clear deduction. For safeguards/FPIC/grievance/benefit-sharing, the more recent monitoring report (2022) is privileged over the older monitoring report (2012) because it is later and likely reflects updated VCS requirements, but the contradiction still lowers confidence. For verified ERs (2,745,232 vs 478,420), neither value can be safely assumed without reconciliation; the higher figure is treated as higher over-crediting risk and the contradiction drives a downward adjustment. For the crediting period, the monitoring report’s longer period (2007-2028) conflicts with the earlier validation report (2009-2016); the monitoring report is privileged as the more recent operational record, but the inconsistency reduces reliability and claim clarity.
Audit Analysis
This is a grid-connected hydro project under ACM0002 with additionality confirmed by the VVB, but several internal inconsistencies across documents reduce confidence in key parameters and reported outcomes. Leakage treatment and crediting-period details are unclear/inconsistent, and the monitoring report lists multiple corrective actions related to missing parameters and meter calibration evidence.
Project Description
Nansha Hydro Power Project in Yunnan Province China (hereafter referred to as the proposed project) is a hydro power plant with a new reservoir in Yuanyang County of Honghe Hani & Yi Autonomous State Yunnan Province China. Three water turbines and related generators with each capacity of 50MW are adopted, and the annual generated electricity is 702,280MWh with annual operation hours of 4,682h, (the annual grid-connected electricity is 616,314MWh)1. The electricity will be connected to Yunnan Province Power Grid, finally to South China Power Grid through 110KV transmission lines. The surface area at full reservoir level of the proposed project is 8,938,000 m2 and the installed capacity is 150MW (3¡Á50MW), so the power density of the proposed project is 16.8W/ m2.
Red Flags
- Large discrepancy in verified emission reductions between validation reports (2,745,232 vs 478,420), raising over-crediting and data reliability concerns
- Leakage treatment is inconsistent across documents (quantified in the validation report but not addressed in the monitoring report), with no clear leakage deduction reported
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 478,420 | 451,485 | 26,935 | |
| 2012 | 90,078 | 87,988 | 2,090 | |
| 2013 | 282,792 | 181,049 | 101,743 | |
| 2014 | 8,750 | 8,750 | 0 | |
| 2015 | 9,750 | 9,750 | 0 | |
| 2016 | 125,000 | 87,399 | 37,601 | |
| 2017 | 125,550 | 8,551 | 116,999 | |
| Total | 1,120,340 | 834,972 | 285,368 |
Cosa migliorerebbe questo punteggio
- Publish a clear reconciliation table linking monitoring-period ER calculations to issuance records, resolving the conflicting ER totals across validation documents.
- Provide explicit leakage assessment and (if applicable) a quantified leakage deduction consistent across the monitoring and validation/verification documentation, plus complete meter calibration records and missing parameter tables requested in the monitoring report.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversals indicated
Inconsistent/unclear leakage treatment
Project-specific baseline; reassessment timing unclear
Safeguards/FPIC reported but inconsistent across years
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →