Re-assessment pending
Nanyang Danjiang River Solar Cooker Project Phase I
- Standard
- CDM
- Methodology
- AMS-I.C (CDM)
- Registry
- CDM-6125 ↗ · Registered
- Country
- China
- Credit type
- Solar
Nanyang Danjiang River Solar Cooker Project Phase I (CDM-6125) is being re-assessed under the current CarbonMeld methodology (v3): its earlier rating came from an older version of the method and is no longer shown, so this page gives no CarbonMeld rating until the new analysis is published.
Assessment
Being reassessed under the current method
The earlier analysis of this project used an older version of our method, so its rating is no longer shown: it is not comparable with ratings under the current method (v3). The new analysis will appear here once it is published; until then, this page shows the project's registry data.
Standard and methodology
Evidence
Eligibility & market
Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. This page keeps the project's record.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 145,285 | 0 | 145,285 | |
| 2016 | 216,156 | 0 | 216,156 | |
| 2018 | 156,461 | 0 | 156,461 | |
| 2019 | 81,564 | 0 | 81,564 | |
| 2020 | 116,585 | 0 | 116,585 | |
| 2021 | 56,011 | 0 | 56,011 | |
| Total | 772,062 | 0 | 772,062 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2012–2013AMS-I.C v19.0since replaced by v22.0
monitoring report
official page · verified on
2013–2015AMS-I.C v19.0since replaced by v22.0
monitoring report
official page · verified on
2015–2016AMS-I.C v19.0since replaced by v22.0
monitoring report
official page · verified on
2018AMS-I.C v19.0since replaced by v22.0
monitoring report
official page · verified on
2018–2020AMS-I.C v19.0since replaced by v22.0
monitoring report
official page · verified on
2020–2021AMS-I.C v19.0since replaced by v22.0
monitoring report
official page · verified on
- AMS-I.C: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). Nanyang Danjiang River Solar Cooker Project Phase I (CDM-6125): registry data. https://carbonmeld.com/projects/nanyang-danjiang-river-solar-cooker-project-phase-i-cdm-6125/.
The citation names the registry data this page shows; the page gives no CarbonMeld rating.
Similar projects
Same methodology or sector, the same registry first.
- 1.2 MW Captive Power Generation through biomass at Maa Durga Rice Products (P) Ltd., OrissaCDM-9959
- Biomass based Co-generation project by Sterling Agro Industries LtdCDM-5380
- Biomass based renewable energy project in a Solvent Extraction Plant, IndiaCDM-1221
- Rice husk based cogeneration plant (5 MW) at Shibzada Ajit Singh Nagar District, Punjab by M/s Nahar Industrial Enterprises limitedCDM-1130
- Rice husk based Cogeneration Projects at a cluster of rice mills, IndiaCDM-5167
- Thermal Energy Generation using Biomass Briquette at M/s. Garware Polyester Limited, Waluj, Aurangabad, IndiaCDM-8546
- Baanrai 9.9 MW Biomass Power Plant in Uthaithani, ThailandCDM-9543
- Rice Husk based cogeneration plantCDM-3907
