Skip to main content
GSSolar Thermal - HeatChinaAMS-I.C

Nanyang Danjiang River Solar Cooker Project Phase II (GS1588 CER to VER conversion)

GS-702 ↗ · current registry ID: GS4126

#44of 150 in Cookstoves#408of 1084 in China#448of 1801 in Gold Standard (GS)#17of 115 in AMS-I.C

5.4/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
6.0

Audit Analysis

A Gold Standard solar cooker project in China with a basic investment-test additionality assessment and a project-specific baseline, but lacking a buffer pool, verified usage rates, and a robust leakage justification. The reported emissions reductions are internally consistent on a pro-rata basis, though several key verification data points remain unconfirmed in the available record.

Red Flags

  • Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis of displaced coal being used elsewhere
  • Usage rate of 120 (assumed) has no corresponding verified figure in the monitoring or verification reports
  • Total verified ERR figure is not stated in the available documents, leaving the claimed 96,599 tCO2e unconfirmed by an independent measurement

Credit Vintages Exhausted

IssuedRetiredAvailable
2012
4,0304,0300
Total4,0304,0300

Risk Indicators

Additionality

Investment test present; VVB confirmation not explicitly stated

Permanence

cooker lifespan risk unaddressed

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific; no reassessment date

Safeguards

Grievance mechanism and benefit sharing noted; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05AMS-I.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents