Skip to main content
GSBiogas - HeatCambodiaAMS-I.F

National Biodigester Programme Phase IV

GS-3093 ↗ · current registry ID: GS11138

#195of 268 in Biogas#12of 18 in Cambodia#1463of 1801 in Gold Standard (GS)#26of 44 in AMS-I.F

4.3/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
3.5
Documentation
4.0

Audit Analysis

The National Biodigester Programme Phase IV in Cambodia has a VVB-confirmed additionality assessment and a quantified 5% leakage deduction, but is significantly undermined by 24 corrective actions flagged in the verification report, eight inter-document contradictions (including a 100× discrepancy in the FNRB value and a 4.4× gap between the monitoring report's claimed ERR and the verified figure), and the absence of a buffer pool or permanence mechanism. The project's verified credits (61,000 tCO₂e) are within a reasonable range of the pro-rata ex-ante expectation, but the volume of unresolved methodological and reporting deficiencies raises material concerns about the robustness of the underlying MRV.

Red Flags

  • The monitoring report claims 270,441.6 tCO₂e while the verification report confirms only 61,000 tCO₂e — a 4.4× over-claim that was not verified by the VVB.
  • The FNRB value is reported as 20% (national default, verification report) versus 0.2% (local field, monitoring report) — a 100× discrepancy that materially affects credit volume.
  • 24 corrective actions were required by the verification report, spanning missing methodology parameters, incorrect SDG calculations, undefined project boundaries, and absent monitoring methods.
  • The ex-ante lifetime ERR in the PDD (108,586 tCO₂e) is 74% higher than the figure confirmed in the verification report (62,296 tCO₂e), indicating a significant downward revision.

Credit Vintages

IssuedRetiredAvailable
2022
2650265
2023
5240524
2024
29,287029,287
2025
30,924030,924
Total61,000061,000

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, measured, reassessed 2018

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05Methodology for Animal Manure Management and Biogas use for Thermal Energy Generation; AMS-I.F.; Renewable electricity generation for captive use and mini-grid

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents