Nepal Biogas Support Program-CPA 8: 19,445 digesters

GS-1916 ↗ · current registry ID: GS7508

#142of 268 in Biogas#77of 101 in Nepal#1087of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.8
Transparency
5.5
Claim Safety
4.2
Documentation
4.5

Audit Analysis

A large-scale Nepal biogas programme (19,445 digesters under CPA 8 of a Gold Standard PoA) with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by the absence of a buffer pool, unverified usage rates, a project-specific baseline, and a long list of material findings and corrective actions. The low extraction confidence and multiple cross-document contradictions (notably on FNRB method and crediting period) reduce confidence in the data record.

Red Flags

  • No buffer pool or permanence mechanism is documented for a project type (biogas digesters) where equipment failure and reversal risk are material; no reversal-event data is available either.
  • FPIC was not conducted (explicitly recorded as false in the extracted record), despite the project affecting 19,445 rural households.
  • The verification report lists numerous material findings including formula discrepancies, non-operational digesters identified during site visits, and a statement that actual emission reductions are lower than ex-ante estimates due to reduced operational status.
  • FNRB method is recorded as 'national default' in the 2026 verification report but as 'local field' in the 2020 monitoring report — an unresolved methodological contradiction.
  • Crediting period is stated as 2017–2022 in the monitoring report but 2024–2031 in the 2024 validation report, creating ambiguity about which period the ex-ante estimate of 455,721 tCO₂e applies to.

Credit Vintages

IssuedRetiredAvailable
2017
13,573013,573
2018
54,229054,229
2019
60,720060,720
2020
56,218056,218
Total184,7400184,740

Risk Indicators

Additionality

VVB-confirmed but test type unspecified

Permanence

reversal risk unaddressed

Leakage

5% quantified deduction with justification

Baseline

Project-specific; reassessed 2024

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents