4.3/ 10
Integrity
3.5
Transparency
5.0
Claim Safety
4.0
Documentation
5.5

Audit Analysis

The Nkongsamba biochar project in Cameroon was verified by EnergyLink Services with no material findings, and the 184 tCO2e claimed matches the verified figure exactly. However, critical integrity elements — additionality testing, baseline methodology, buffer pool, and leakage treatment — are absent from the extracted record, creating significant uncertainty around the robustness of a 100-year permanence claim. The project is best understood as a verified but under-documented removal credit with meaningful gaps in its environmental integrity case.

Red Flags

  • 100-year permanence claim with no buffer pool or reversal-risk mitigation documented in the verification report
  • No additionality test type or VVB confirmation of additionality found in any available document
  • No baseline methodology or baseline reassessment date stated, leaving the counterfactual unanchored
  • No leakage deduction or justification provided for a biochar project where feedstock-sourcing and production leakage are expected
  • Safeguards, FPIC, and grievance mechanism all absent from the extracted record

Credit Vintages Exhausted

IssuedRetiredAvailable
2022
1841840
Total1841840

Risk Indicators

Additionality

No additionality test found

Permanence

100-yr claim, no buffer pool

Leakage

No leakage treatment stated

Baseline

Baseline method not stated

Safeguards

No safeguards documented

Double-claim

CORSIA/CCP status unknown

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents