NetZero-002-Lajinha
Score Breakdown
Integrity
verified The verification report (2025) confirms additionality using an investment test and reports no material findings or corrective actions.
missing Leakage and permanence risk management (buffer/reversal provisions) were not found in the extracted record, weakening confidence in net removals.
Transparency
verified A VVB is identified (350Solutions) and a clear monitoring period is stated (2024-11-01 to 2025-10-31) in the verification record.
missing Claimed vs verified removal totals were not found in the extracted record, and low readability reduces MRV transparency.
Claim Safety
verified Baseline reassessment timing is stated (2023) alongside a project baseline approach under the Biochar Methodology v3.1.
missing CORSIA and CCP status were not found in the extracted record, and missing leakage/permanence quantification increases over-crediting and greenwashing risk.
Documentation
verified The extracted record references multiple documents (6) and includes a dated verification report (2025-12-17).
missing Evidence document labeling is weak (listed as "unknown") and extraction confidence is low, indicating incomplete/uncertain documentation capture.
Detailed Analysis
Integrity
The verification report (2025-12-17) indicates additionality was assessed via an investment test and confirmed by the VVB, and it reports no material findings and no corrective actions. The baseline is described as project-specific, with a baseline reassessment year of 2023, but the underlying baseline parameters and quantified outcomes were not found in the extracted record. Permanence controls (buffer contribution) and any reversal monitoring/results were not found in the extracted record, which is a material gap for a removal project. Leakage treatment (deduction and justification) was also not found in the extracted record, reducing confidence that net removals are conservatively estimated.
Transparency
The VVB is identified as 350Solutions and the monitoring period is clearly stated (2024-11-01 to 2025-10-31) in the verification record. However, the total removals claimed and the total removals verified were not found in the extracted record, preventing a basic cross-check of issuance quantities against verification. The evidence document list is not specific ("unknown"), and the minimum extraction confidence is low, suggesting that key MRV details may be missing or unreadable in at least one source document.
Claim Safety
The project is a biochar removal activity under the Biochar Methodology v3.1, with a project-specific baseline and a stated baseline reassessment year (2023), which helps but does not by itself demonstrate conservative crediting. CORSIA eligibility and CCP status were not found in the extracted record, so buyers cannot easily assess alignment with higher-integrity claim frameworks. Missing quantified leakage treatment and missing permanence risk provisions (buffer/reversal details) elevate the risk of over-crediting and therefore increase greenwashing exposure for end users.
Documentation
A verification report dated 2025-12-17 is present and the extracted record indicates six documents were used, which is a positive sign for coverage. Nonetheless, the evidence documents are not clearly identified (listed as "unknown"), and the minimum extraction confidence is low, indicating at least one key document was poorly readable. Given these issues, several critical fields (verified removals, leakage, buffer/reversal provisions, crediting period) were not found in the extracted record, limiting documentation completeness.
Overall
No contradictions were reported in the extracted record, so there are no cross-document discrepancies to resolve. The overall score is driven by a mix of positives (VVB-confirmed additionality; no material findings; safeguards elements like FPIC and a grievance mechanism noted in the verification record) and major evidence gaps (verified removal totals, leakage treatment, and permanence risk management details not found in the extracted record). Because documentation quality is weakened by low extraction confidence and non-specific evidence document labeling, confidence in the transparency and claim robustness is constrained. Note: if documentation were to score below 3.0, transparency would be capped by the gate rule; and if integrity were below 4.0, the overall would be capped at 6.0 (not applied here, but relevant to interpretation).
Audit Analysis
The verification record indicates additionality was assessed via an investment test and confirmed by the VVB, with no material findings or corrective actions reported. However, key quantifications that underpin credit integrity and claims (verified removals, leakage treatment, permanence/buffer approach) were not found in the extracted record, and at least one key document was poorly readable, limiting confidence.
Project Description
PUR-141608 — Biomass Removal
Red Flags
- Verified removal volume was not found in the extracted record, limiting confidence in the credited amount.
- Leakage deduction and its justification were not found in the extracted record for a biomass/biochar project where upstream and market leakage can be relevant.
- Permanence risk management details (e.g., buffer contribution or reversal provisions) were not found in the extracted record.
- Low extraction confidence indicates at least one key document was poorly readable, increasing the risk of missing or misread critical parameters.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 480 | 480 | 0 | |
| 2025 | 4,731 | 4,731 | 0 | |
| Total | 5,211 | 5,211 | 0 |
Cosa migliorerebbe questo punteggio
- Provide the verified net removal total for the monitoring period and a clear reconciliation between claimed and verified quantities in the verification/monitoring documentation.
- Disclose and document leakage assessment (including any deduction and justification) and permanence risk management (buffer contribution and reversal monitoring provisions) in publicly accessible project documents.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Buffer/reversal provisions not evidenced
Leakage treatment not evidenced
Project baseline; limited detail
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →