Nhon Hoa 1 Wind Power Project
GS-3435 ↗ · current registry ID: GS11414
#625of 1935 in Renewable energy#30of 80 in Vietnam#326of 1801 in Gold Standard (GS)#483of 1287 in ACM0002
Audit Analysis
The Nhon Hoa 1 Wind Power Project is a grid-connected wind facility in Vietnam with a VVB-verified investment additionality test and no reversal risk, but it is undermined by the absence of FPIC, an unaddressed leakage justification, and a series of data-quality errors (incorrect energy values in the PDD, meter discrepancies, a 38-VER miscalculation) that required eight corrective actions. Pro-rata delivery is reasonable at roughly 102% of the ex-ante expectation for the elapsed monitoring period, so over-crediting risk is low, yet the documentation record contains six inter-document contradictions that erode confidence in the underlying data.
Red Flags
- FPIC was not conducted according to the validation report (TÜV SÜD, Dec 2023), contradicting the PDD's claim that it was; the VVB's independent assessment is privileged.
- Leakage deduction is 0% with the justification recorded as 'not addressed' in the most recent verification report (Nov 2025), despite an earlier verification report (Feb 2024) describing it as 'quantified'.
- The PDD and ER spreadsheet contained incorrect energy generation and export values (214,567 MWh instead of 184,607 MWh), flagged as a material finding and requiring correction.
- Backup meter (L2) readings did not tally with the main meter and backup meter (L1) for December 2022, indicating a monitoring-system reliability issue.
- Six contradictions exist across the document set (leakage justification, baseline method, ERR figures, additionality test type, FPIC status), reducing overall data reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 21,788 | 276 | 21,512 | |
| 2022 | 130,139 | 0 | 130,139 | |
| 2023 | 128,597 | 0 | 128,597 | |
| 2024 | 131,764 | 0 | 131,764 | |
| 2025 | 74,879 | 0 | 74,879 | |
| Total | 487,167 | 276 | 486,891 |
Risk Indicators
VVB-verified investment test
Avoidance project, no reversals
0% deduction, justification not addressed
Project-specific, grid EF 2021
Grievance mechanism present, FPIC not conducted
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →