The Nikopolska Solar Farm is a methodologically sound solar avoidance project with a jurisdictional baseline and VVB-confirmed additionality, but its credit integrity is undermined by nine material findings—including an incorrect emission reduction formula, a missing PPA, and missing proof of ownership—along with a significant discrepancy in reported emission reduction figures between two validation reports. The project delivered approximately 99% of its pro-rata expectation for the elapsed monitoring period, suggesting the overall credit volume is reasonable, but the unresolved corrective actions and documentation gaps create meaningful risk.

Red Flags

  • Nine material findings in the monitoring report, including an incorrect emission reduction formula (CAR 06) that directly undermines the validity of the credit calculation under ACM0002 v21.0
  • Contradiction in total ERR between two validation reports: 879,989 tCO2 (Aug 2024) vs 190,113 tCO2 (Apr 2024), a 4.6× discrepancy that raises data reliability concerns
  • Missing PPA, proof of ownership, and representation deed—fundamental documents for establishing project legitimacy and operational status
  • Missing calibration certificates and inconsistent meter accuracy class between the PDDMR and supporting documents, casting doubt on the reliability of energy output measurements

Credit Vintages

IssuedRetiredAvailable
2019
159,3830159,383
2020
190,1130190,113
2021
190,1130190,113
2022
190,1130190,113
2023
190,1120190,112
2024
190,1130190,113
2025
190,1130190,113
2026
190,1130190,113
2027
190,1130190,113
2028
190,1130190,113
2029
30,730030,730
Total1,901,12901,901,129

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, appropriate for solar

Baseline

Jurisdictional, reassessment timing not stated

Safeguards

Mentioned, benefit sharing described, no FPIC or grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents