Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Turkey Registry: RegisteredACM0002

Niksar Hydroelectric Power Plant

VCS-1019 ↗

#879of 1935 in Renewable energy#176of 295 in Turkey#545of 1339 in Verra (VCS)#691of 1287 in ACM0002

5.3/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
3.5

Audit Analysis

The Niksar Hydroelectric Power Plant is a registered VCS renewable-energy project with a VVB-confirmed investment additionality test and no reported reversal events, but it is undermined by a project-specific baseline, a 0% leakage deduction, and a very large number of material findings and corrective actions (20 and 30+ respectively) that point to significant documentation and consistency weaknesses. The low extraction confidence across the document set further erodes confidence in the underlying data. Overall the project is functional and conservative in its verified output relative to the ex-ante estimate, but the quality of its documentation and the volume of unresolved findings place it in the mid-range.

Red Flags

  • 20 material findings and 30+ corrective actions identified in the 2025 verification report, including inconsistent project descriptions, incorrect coordinates, missing meter installation dates, incomplete monitoring plan, and lack of justification for project ownership
  • Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable, which undermines confidence in the extracted data
  • Baseline method shifted from 'jurisdictional' (2013 validation) to 'project-specific' (2025 verification), a downgrade in baseline robustness
  • Crediting period contradiction: the 2025 verification report references the 2012–2022 period while a January 2025 validation report references a new 2022–2032 period, creating ambiguity about which period the verified credits belong to

Credit Vintages Exhausted

IssuedRetiredAvailable
2012
78,95478,9540
2013
202,586202,5860
2014
35,25535,2550
2015
129,427129,4270
2016
139,943139,9430
2017
79,68379,6830
2018
79,58079,5800
2019
171,835171,8350
2020
168,415168,4150
2021
46,88346,8830
Total1,132,5611,132,5610

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, quantified justification

Baseline

Project-specific, not jurisdictional

Safeguards

FPIC, grievance mechanism documented

Double-claim

CORSIA excluded, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents