Noritec, Stall im Mölltal, Austria
#166of 352 in Biomass#63of 111 in Puro.earth (PUR)
Audit Analysis
The Noritec bio-based construction materials project in Austria has a combined additionality test, an LCA, and documented feedstock sustainability, but suffers from significant evidence gaps: carbon content was not tested, no buffer pool or leakage treatment is stated, and both claimed and verified ERR figures are absent from the extracted record. The project is low-risk in terms of contradictions and material findings, but the missing quantitative verification data limits confidence in the carbon removal claim.
Red Flags
- Carbon content of the construction material was not tested, undermining the fundamental basis of the carbon removal claim
- No buffer pool percentage is stated despite a 50-year permanence claim, leaving reversal risk unmitigated
- No leakage deduction or justification is provided in the extracted record
- Both claimed and verified ERR figures are absent, preventing any assessment of over- or under-delivery
- Additionality VVB verification status is not confirmed in the available documents
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 47,600 | 47,600 | 0 | |
| Total | 47,600 | 47,600 | 0 |
Risk Indicators
Combined test present; VVB confirmation unconfirmed
50-yr claim; no reversal data
No deduction or justification stated
Project-specific; no reassessment date
FPIC and grievance mechanism not stated
CORSIA and CCP status both unstated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →