Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Namibia Registry: RegisteredAMS-I.D

Ombepo Wind

VCS-1915 ↗

#5of 8 in Namibia#546of 1339 in Verra (VCS)#287of 806 in AMS-I.D

5.3/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The Ombepo Wind project is a straightforward renewable-energy avoidance project in Namibia with a VVB-confirmed additionality assessment and no reversal events, but its credibility is undermined by 13 corrective actions flagged by the VVB, 10 cross-document contradictions (including conflicting baseline-method and additionality-test descriptions), and the absence of a stated buffer-pool percentage. The verified ERR matches the claimed figure exactly for the 2024–25 monitoring period, and the project is explicitly not CORSIA-eligible, which limits dual-channel risk.

Red Flags

  • 13 corrective actions issued by the VVB (Carbon Check) covering inconsistent monitoring-period labels, missing meter calibration certificates, ERs claimed for dates outside the crediting period, and unrounded emission-reduction figures
  • Baseline method is described as 'project' in the 2025 verification report but 'jurisdictional' in the 2025 monitoring report — a material inconsistency for an AMS-I.D wind project
  • Additionality test type is 'first_of_its_kind' in the validation report (June 2019) but 'combined' in the PDD (July 2019); the PDD is more recent and should prevail, but the discrepancy weakens confidence
  • Crediting period is stated as 2017-09-08 to 2027-09-07 in the 2025 verification report but 2018-04-01 to 2028-03-31 in an earlier (2021) document

Credit Vintages

IssuedRetiredAvailable
2017
7,9236,4231,500
2018
22,01622,0160
2019
22,02417,1624,862
2020
12,51712,012505
2021
21,98213,0538,929
2022
21,59818,0813,517
2023
22,40410,63711,767
2024
21,767021,767
2025
10,997010,997
Total163,22899,38463,844

Risk Indicators

Additionality

VVB-confirmed but test type contradicts across PDD and validation report

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction justified as negligible for wind-avoidance project

Baseline

Grid-EF baseline used but method label contradicts across documents

Safeguards

FPIC and grievance mechanism confirmed in 2025 VR but absent in 2023 VR

Double-claim

Explicitly not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents