Orb Energy Solar Project India
Score Breakdown
Integrity
verified The project uses a project baseline and the verification report cites a combined additionality test, which is better than having no additionality evidence.
missing Reversal risk is not addressed, buffer pool coverage is not found, and the verification report records 3 CARs and 3 CLs.
Transparency
verified A named VVB is provided, and the monitoring period is clearly stated in the verification report.
missing Total claimed ERs are not found in the extracted record, and key MRV fields such as grid emission factor and FNRB are not stated.
Claim Safety
verified Leakage is shown as quantified with a leakage deduction of 0%, which is better than an unaddressed leakage claim.
missing The project-specific baseline and missing FNRB/usage-rate evidence leave some over-crediting risk unresolved.
Documentation
verified The record includes a verification report, a named VVB, and multiple safeguard indicators such as FPIC and a grievance mechanism.
missing The extraction confidence is only medium, and the verification report lists 3 CARs and 3 CLs, indicating documentation issues.
Detailed Analysis
Integrity
The verification report from Earthood Services Private Limited shows a combined additionality test and a project baseline under AMS IA Version 14 and AMS IC Version 19, which supports the project concept. However, additionality is not explicitly confirmed by the VVB in the extracted record, reversal events are marked as not addressed, and there is no buffer pool information. The report also notes 3 CARs and 3 CLs, which reduces confidence in the strength of the underlying controls.
Transparency
The monitoring period is clearly stated as 2013-01-01 to 2014-12-31, and the VVB is named in the verification report. At the same time, total claimed emission reductions are not found in the extracted record, and important MRV fields such as the grid emission factor and FNRB are not stated. That leaves the public-facing accounting trail incomplete.
Claim Safety
The record shows a quantified leakage treatment with a leakage deduction of 0%, which is preferable to no leakage treatment. Still, the baseline remains project-specific rather than a recently reassessed standardized baseline, and the extracted record does not provide FNRB or verified usage-rate evidence. Those gaps leave some residual over-crediting risk.
Documentation
The documentation set appears to include at least a verification report, with safeguards such as FPIC, a grievance mechanism, and benefit sharing described. However, extraction confidence is only medium, and the verification report identifies 3 CARs and 3 CLs, suggesting the file set is not fully clean. The crediting period start is present, but the end date is not found in the extracted record, which further limits completeness.
Overall
I privileged the 2015-01-12 verification report over the older 2013-11-15 record where the contradiction field indicates a later, higher-priority source. That means I accepted the quantified leakage treatment and the later crediting-period start, but the unresolved reversal treatment, missing VVB confirmation of additionality, and the 3 CARs/3 CLs still weigh on the score. The contradiction on the crediting period and the leakage justification shows some document inconsistency, so I reduced confidence rather than assuming the best case.
Audit Analysis
This is a renewable electricity project with a project baseline and a combined additionality test, but the extracted record does not show VVB confirmation of additionality and the reversal treatment is not addressed. The verification report also records 3 CARs and 3 CLs, which weakens confidence in the documentation quality and claim robustness.
Project Description
Developer: J.P. Morgan Type: Solar Thermal - Electricity Size: Small Scale Methodology: AMS-I.A. Electricity generation by the user Crediting period: 2010-09-12 → 2017-09-11 Estimated annual credits: 22832 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth
Red Flags
- Additionality is described as a combined test, but VVB confirmation is not stated in the extracted record.
- The project has 3 CARs and 3 CLs in the verification report, and reversal risk is not addressed.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 1,482 | 1,482 | 0 | |
| 2011 | 6,827 | 6,827 | 0 | |
| 2012 | 10,264 | 10,264 | 0 | |
| 2013 | 13,120 | 13,120 | 0 | |
| 2014 | 13,396 | 13,396 | 0 | |
| Total | 45,089 | 45,089 | 0 |
Cosa migliorerebbe questo punteggio
- Provide the full verification and monitoring package showing explicit VVB confirmation of additionality, the final credited emission reductions, and the complete crediting-period dates.
- Document reversal treatment, buffer pool coverage or equivalent permanence safeguards, and clearer evidence for baseline, FNRB, and usage-rate assumptions.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Combined test present, VVB confirmation not stated
Reversal risk not addressed
Quantified leakage with 0% deduction
Project baseline, reassessment not stated
FPIC and grievance mechanism documented
CORSIA and CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →