Ouarzazate II Concentrated Solar Power Project
#451of 1935 in Renewable energy#2of 12 in Morocco#231of 1339 in Verra (VCS)#339of 1287 in ACM0002
Audit Analysis
The Ouarzazate II CSP project has a fundamentally sound design with VVB-confirmed additionality and a jurisdictional baseline, but is undermined by data-quality issues flagged in the verification report (meter calibration delays, grid emission factor inconsistencies, and multiple corrective actions). The low extraction confidence and contradictions between documents reduce confidence in the reported figures, though the underlying methodology (ACM0002 for displaced grid electricity) is well-established.
Red Flags
- Grid emission factor used in the monitoring report is inconsistent with the approved PDD, as flagged in the verification report corrective actions
- Multiple energy meter readings are inconsistent with reported export/import/net electricity figures; import value of zero for all months deemed unrealistic by the VVB
- Benefit sharing is described in the verification report but not in the monitoring report (same date, 2024-12-16), creating an internal inconsistency
- Baseline method is stated as 'jurisdictional' in the 2024 monitoring report but 'project' in the 2019 validation report — unresolved discrepancy
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 172,470 | 0 | 172,470 | |
| 2019 | 384,236 | 151,405 | 232,831 | |
| Total | 556,706 | 151,405 | 405,301 |
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deduction, quantified justification
Jurisdictional, but method discrepancy across docs
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.