OUARZAZATE III CONCENTRATED SOLAR POWER PROJECT
#1868of 1935 in Renewable energy#12of 12 in Morocco#1301of 1339 in Verra (VCS)#1278of 1287 in ACM0002
Audit Analysis
The Ouarzazate III CSP project is a renewable energy project with a jurisdictional baseline and no permanence risk, but it is severely undermined by a confirmed Gold Standard registry listing (GS ID5019) that contradicts the project's claim of no other GHG program registration, an unconfirmed additionality assessment, and a long list of material findings and corrective actions. The project delivered only about 39% of its pro-rata ex-ante expectation for the elapsed monitoring period, and the verification was conducted remotely without a site visit or stakeholder interviews.
Red Flags
- Project was listed on the Gold Standard registry (GS ID5019) despite claiming no other GHG program registration — a direct double-claiming risk
- Additionality test type and VVB confirmation are not stated in any available document
- Actual emission reductions were significantly lower than ex-ante estimates due to low generation (only ~39% of pro-rata expectation delivered)
- No site visit was conducted; the audit was performed remotely and no stakeholders were interviewed
- Net generation calculation did not discount offline consumption as required by methodology ACM0002 v19
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 34,108 | 16,429 | 17,679 | |
| 2019 | 93,372 | 70,194 | 23,178 | |
| Total | 127,480 | 86,623 | 40,857 |
Risk Indicators
Test type not stated; VVB confirmation not found
Renewable energy; reversal not applicable
0% deemed negligible; reasonable for CSP
Jurisdictional; reassessment date not stated
Grievance mechanism present; FPIC and benefit sharing not confirmed
Gold Standard listing (GS ID5019) found
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →