Oya Hybrid Project
#7of 59 in South Africa#232of 1339 in Verra (VCS)#340of 1287 in ACM0002
Audit Analysis
The Oya Hybrid Project is a VCS renewable energy project (ACM0002) in South Africa with a VVB-confirmed combined additionality test and a jurisdictional baseline, giving it a structurally sound foundation. However, five contradictions between the PDD and the validation report — spanning baseline method, additionality type, FPIC status, leakage treatment, and benefit sharing — combined with a low extraction confidence and several missing operational details (energy source, usage monitoring method) limit confidence in the overall data quality.
Red Flags
- Five contradictions between the PDD and the validation report, including a direct conflict on whether FPIC was conducted (PDD: no; validation report: yes) and on the baseline method (PDD: project-specific; validation report: jurisdictional)
- Energy source is not stated in any available document, which is a critical gap for a renewable energy project under ACM0002
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted record
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
N/A – energy project, no storage
0% deemed negligible, appropriate
Jurisdictional per VVB, contradicted by PDD
FPIC conflict between PDD and VVB
CORSIA and CCP status unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →