Vai al contenuto principale
VCS avoidance Pakistan Registry: Units Transferred from Approved GHG Program Documentazione completa General Methodology v2.0

Pakarab Fertiliser Co-Generation Power Project

VCS-1508 ↗

4.3 / 10
Integrity
5.1
Transparency
4.0
Claim Safety
4.3
Documentation
3.2

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using a barrier test, which supports the project’s core eligibility claim.

missing Leakage is not addressed and no buffer pool or reversal protection is documented in the extracted record.

Transparency

verified The issuance record identifies the VVB as DNV Climate Change Services AS and provides a monitoring period and crediting period.

missing Key MRV details are missing, including the monitoring method, leakage treatment, and any grid emission factor inputs.

Claim Safety

verified No material findings were reported, which reduces immediate over-crediting concern.

missing The record shows a large gap between claimed and verified ERs, and leakage justification is listed as not addressed.

Documentation

verified The record includes multiple official-document fields, including issuance date, VVB name, monitoring period, and crediting period.

missing Extraction confidence is low and the evidence set is limited, with only one evidence document explicitly identified in the extracted record.

Detailed Analysis

Integrity

The issuance record shows additionality was verified by DNV Climate Change Services AS using a barrier test, and no material findings or corrective actions were reported. However, leakage is not addressed, with no quantified deduction or supporting justification, and there is no buffer pool or reversal information in the extracted record. The baseline is project-specific rather than a more robust standardized or jurisdictional baseline, which weakens confidence in long-term integrity.

Transparency

The record provides the VVB name, monitoring period, and crediting period, which helps basic traceability. But important MRV details are missing or not stated in available documents, including the monitoring method, usage monitoring approach, and grid emission factor inputs. Low extraction confidence further reduces transparency because at least one key document was poorly readable.

Claim Safety

Claim safety is weakened by the absence of leakage treatment and by the large difference between claimed and verified ERs in the extracted record. The project is not CORSIA-eligible, which reduces dual-market concern, but CCP status is not stated. Because the record contains contradictory verified issuance figures, the risk of over-crediting or inconsistent reporting is elevated.

Documentation

The documentation set includes an issuance record with multiple core fields, but the extracted evidence list is sparse and the extraction confidence is low. No safeguards, FPIC, or grievance mechanism are documented in the available record, and the contradiction log shows conflicting statements on safeguards, verified ERs, and the crediting period. I privileged the later issuance record dated 2015-11-13 for the main values because it is the most recent official document, but the contradictions still reduce reliability.

Overall

I privileged the later issuance record dated 2015-11-13 over earlier documents because it is the most recent official source, but the contradiction log still shows conflicting values for safeguards, verified ERs, and the crediting period, so reliability is reduced. The project benefits from VVB-confirmed additionality and no reported material findings, yet missing leakage treatment, limited MRV detail, and low extraction confidence keep the overall score moderate. The documentation gate is not triggered here, but the integrity score remains below a strong level because several core risk controls are not evidenced.

Audit Analysis

The project has some integrity support because additionality was confirmed by the VVB and no material findings were reported, but key risk controls are weakly documented. Transparency and documentation are limited by low extraction confidence, missing leakage and monitoring details, and contradictions across documents on verified issuance and crediting period. Overall, this is a moderate-to-low confidence project with meaningful evidence gaps and some reliability concerns.

Project Description

This carbon credit project is not registered with VCS but can be found at the CDM Project ID 2687 website. It aims to reduce carbon emissions and contribute to sustainable development.

Red Flags

  • Leakage treatment is not addressed, with no quantified deduction or justification found.
  • There are contradictions across documents on verified ERs, crediting period, and safeguards documentation.

Credit Vintages

Issued Retired Available
2009
21,979 16,230 5,749
2010
33,437 27,678 5,759
Total 55,416 43,908 11,508

Cosa migliorerebbe questo punteggio

  • Provide a complete leakage assessment, including any quantified deduction and the rationale for it.
  • Publish the underlying monitoring and verification documents with clear MRV methods, safeguards evidence, and reconciliation of the contradictory ER and crediting-period figures.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

No reversal evidence, but no buffer data

Leakage

Leakage not addressed

Baseline

Project baseline, reassessment not stated

Safeguards

No safeguards documented

Double-claim

Not CORSIA-eligible and no CCP approval stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti