Papart Large Scale Run-of-River Hydro Powerplant Project
#1274of 1935 in Renewable energy#239of 295 in Turkey#875of 1339 in Verra (VCS)#992of 1287 in ACM0002
Audit Analysis
The Papart hydro project has a solid jurisdictional baseline and VVB-confirmed investment additionality, but is undermined by 17 material findings in the verification report, a complete absence of permanence assessment, and low extraction confidence across the document set. The project over-delivers relative to its pro-rata expectation (158%), which is consistent with hydro variability, but the volume of unresolved data-quality issues and the shift from a quantified to a 'deemed negligible' leakage justification erode confidence in the credit's integrity.
Red Flags
- 17 material findings in the 2023 verification report, including incorrect baseline emission estimation, missing regulatory surplus demonstration, and incomplete CDM TOOL11 application
- Leakage justification shifted from 'quantified' (2021 verification) to 'deemed negligible' (2023 verification) with a 0% deduction, weakening the original quantification
- Additionality validity for the second crediting period is not described in the project documents
- Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 28,204 | 28,204 | 0 | |
| 2013 | 26,175 | 26,175 | 0 | |
| 2014 | 32,961 | 20,225 | 12,736 | |
| 2015 | 28,304 | 28,304 | 0 | |
| 2016 | 36,659 | 36,659 | 0 | |
| 2017 | 27,761 | 27,761 | 0 | |
| 2018 | 27,701 | 27,701 | 0 | |
| 2019 | 20,955 | 14,296 | 6,659 | |
| 2020 | 20,224 | 20,000 | 224 | |
| 2021 | 24,044 | 0 | 24,044 | |
| 2022 | 30,372 | 0 | 30,372 | |
| Total | 303,360 | 229,325 | 74,035 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, justification shifted to negligible
Jurisdictional, reassessed 2022
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →