PARQUE EÓLICO WESP 01
#713of 1935 in Renewable energy#24of 124 in Colombia#23of 99 in CerCarbono (CC)#555of 1287 in ACM0002
Audit Analysis
PARQUE EÓLICO WESP 01 is a Colombian wind energy project with a solid combined additionality test verified by KBS and a jurisdictional baseline reassessed in 2024. However, the verification report identified 11 material findings including a calculation error in the emissions reduction spreadsheet and multiple inconsistencies in the investment analysis and PDD, which undermine confidence in the credit calculation. The project delivered approximately 89% of its pro-rata annual expectation, which is within normal wind variability, but the documentation quality issues and inter-document contradictions warrant caution.
Red Flags
- Calculation error in the emissions reduction spreadsheet regarding grid consumption (CAR 02) directly affects the integrity of the verified credit figure
- Eleven material findings and eleven corrective actions required in the verification report indicate systemic documentation quality issues
- Contradiction in baseline method between the validation report (project-specific) and the verification report (jurisdictional) creates uncertainty about the actual baseline basis
- Outdated benchmark value in the investment analysis (SAC 2) raises questions about whether additionality was assessed against current economic conditions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 21,123 | 19,989 | 1,134 | |
| 2024 | 17,455 | 0 | 17,455 | |
| Total | 38,578 | 19,989 | 18,589 |
Risk Indicators
Combined test VVB-confirmed
Wind energy, low reversal risk
0% deduction, justification inconsistent
Jurisdictional but method contradicted
FPIC, grievance, benefit sharing
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →