VCSOtherEcuadorVintage 2018 Registry: RegisteredAMS-III.G

Pichacay Landfill Gas Renewable Energy Project

VCS-1883 ↗

#1330of 1935 in Renewable energy#924of 1339 in Verra (VCS)#21of 34 in AMS-III.G

4.7/ 10
Integrity
4.2
Transparency
5.0
Claim Safety
4.8
Documentation
5.2

Audit Analysis

The Pichacay Landfill Gas project is a VCS-registered renewable energy project in Ecuador with VVB-confirmed additionality and documented safeguards, but its integrity is undermined by 14 corrective actions covering formula errors, missing GWP values, and a project-emissions discrepancy. The verified ERR (24,801 tCO₂e) represents only ~75% of the claimed figure (33,233 tCO₂e) for the 2024 monitoring period, and the leakage treatment (0% deduction) is inconsistently justified across documents. Overall, the project is functional but carries moderate data-quality and calculation-robustness risks.

Red Flags

  • 14 corrective actions in the verification report include a formula discrepancy for the methane fraction (FCH4,PJ,y), a missing GWP value for methane, and a project-emissions mismatch for 2020 — all of which affect the ERR calculation
  • Leakage justification is contradictory: the 2019 verification report states leakage was 'not addressed' while the 2025 monitoring report claims it was 'deemed negligible', with a 0% deduction in both cases
  • Verified ERR (24,801 tCO₂e) is only ~75% of the claimed ERR (33,233 tCO₂e) for the 2024 monitoring period, indicating a material gap between project claims and VVB-verified reductions
  • Missing ex-ante/ex-post emission reduction comparison (CAR 12) prevents independent verification that the project is delivering within its original estimates

Credit Vintages

IssuedRetiredAvailable
2017
13,37713,3770
2018
24,88219,5795,303
2019
18,138018,138
2020
24,85212,23512,617
2021
11,44411,4440
2023
24,80124,8010
2024
33,2338,23325,000
Total150,72789,66961,058

Risk Indicators

Additionality

VVB-confirmed but test type not stated

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, modeled, no reassessment date

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-III.G

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents