Skip to main content
VCSAgriculture Forestry and Other Land UsePeru Registry: RegisteredGeneral Methodologyv2.1

Planting for the Future: Financially sustainable agroforestry systems and payments for ecosystem services

VCS-1351 ↗

#166of 261 in Soil carbon#19of 24 in Peru#1075of 1339 in Verra (VCS)

4.3/ 10
Integrity
5.0
Transparency
3.5
Claim Safety
4.5
Documentation
3.5

Audit Analysis

A registered VCS agroforestry project in Peru with a verified combined additionality test and a 14% buffer pool, but critically lacking any monitoring data to verify actual carbon delivery. Significant contradictions exist between two versions of the validation report regarding the lifetime ERR (9,147 vs 21,595 tCO2e) and the crediting period (5 vs 30 years), and the 0% leakage deduction rests on a weak 'deemed negligible' justification for a project type where displacement risk is plausible.

Red Flags

  • Two versions of the validation report (2015-02-18 and 2015-03-23) report materially different lifetime ERR figures (21,595 vs 9,147 tCO2e) and crediting periods (30 years vs 5 years), creating uncertainty about the true ex-ante claim
  • No monitoring reports or verified ERR data are available in the extracted record, making it impossible to confirm whether the project delivered any credits or to assess over/under-delivery
  • Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis, which is a weak basis for an agroforestry project in a developing-country context where land-use displacement is a recognised risk
  • 16 nonconformances were raised at validation, including two directly questioning the application of the additionality decision tree (NCR 10 and NCR 13), indicating the additionality case required substantial correction before approval

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Buffer pool present; no monitoring data to confirm zero reversals

Leakage

0% deduction; 'deemed negligible' justification is weak for agroforestry

Baseline

Project-specific; no reassessment date stated (not yet due under 10-yr rule)

Safeguards

FPIC conducted; grievance mechanism present; safeguards documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents