Audit Analysis
Point Enerji PV Bundle is a solar PV project in Turkey using the well-established ACM0002 V22 methodology with a jurisdictional baseline and a combined additionality test. The project is in its early crediting period (started March 2024) with no monitoring data yet available, and no VVB name or verified emission reduction figures can be found in the extracted record. The main integrity concerns are the absence of a buffer pool and the lack of a named verification body, while the leakage treatment and permanence argument are reasonable for a grid-connected solar project.
Red Flags
- No VVB name or verification report identified in the extracted record; additionality test (combined) is present in the PDD but independent verification cannot be confirmed
- Contradiction between PDD and appendix on leakage treatment (deemed negligible vs. quantified) and on benefit sharing (described vs. not described)
- No monitoring period or verified ERR data available; the project's actual performance cannot be assessed against its 336,740 tCO2 lifetime claim
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 26,019 | 0 | 26,019 | |
| 2025 | 33,674 | 0 | 33,674 | |
| 2026 | 33,674 | 0 | 33,674 | |
| 2027 | 33,674 | 0 | 33,674 | |
| 2028 | 33,674 | 0 | 33,674 | |
| 2029 | 33,674 | 0 | 33,674 | |
| 2030 | 33,674 | 0 | 33,674 | |
| 2031 | 33,674 | 0 | 33,674 | |
| 2032 | 33,674 | 0 | 33,674 | |
| 2033 | 33,674 | 0 | 33,674 | |
| 2034 | 7,655 | 0 | 7,655 | |
| Total | 336,740 | 0 | 336,740 |
Risk Indicators
Combined test in PDD, no VVB confirmation found
mixed evidence / unresolved risk
0% deduction, PDD vs appendix inconsistency on treatment
Jurisdictional baseline, 2021 grid EF, standard methodology
FPIC conducted, grievance mechanism present, safeguards documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →