Pokrovska Solar Farm
#880of 1935 in Renewable energy#3of 8 in UA#21of 154 in Intl. Carbon Registry (ICR)#693of 1287 in ACM0002
Audit Analysis
The Pokrovska Solar Farm is a straightforward grid-connected solar project with a jurisdictional baseline and VVB-confirmed additionality, and its verified emissions reductions track closely to the pro-rata ex-ante expectation. However, six unresolved Corrective Action Requests—including an incorrect emission reduction formula—along with inconsistencies in reported ERR figures across validation reports and the absence of CORSIA/CCP eligibility determinations introduce meaningful data-reliability and over-crediting risk.
Red Flags
- Six open Corrective Action Requests remain unresolved, including an incorrect emission reduction formula relative to the applicable methodology (ACM0002 v21.0)
- Inconsistent ERR figures appear across validation reports dated 2025-02-04, 2025-02-25, and 2025-03-26, creating ambiguity over whether the claimed figure is annual (≈227,443 tCO₂e) or cumulative (≈913,735 tCO₂e)
- CORSIA eligibility and CCP approval status are not stated in any available document, leaving dual-channel risk unassessed
- Free, Prior and Informed Consent (FPIC) was not conducted, despite safeguards and a grievance mechanism being referenced
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 57,328 | 0 | 57,328 | |
| 2020 | 227,444 | 0 | 227,444 | |
| 2021 | 227,444 | 0 | 227,444 | |
| 2022 | 227,444 | 0 | 227,444 | |
| 2023 | 227,444 | 0 | 227,444 | |
| 2024 | 227,444 | 0 | 227,444 | |
| 2025 | 227,444 | 0 | 227,444 | |
| 2026 | 227,444 | 0 | 227,444 | |
| 2027 | 227,444 | 0 | 227,444 | |
| 2028 | 227,444 | 0 | 227,444 | |
| 2029 | 170,115 | 0 | 170,115 | |
| Total | 2,274,439 | 0 | 2,274,439 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals
0% deduction, justified as negligible
Jurisdictional grid EF (0.643, 2022)
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →