Skip to main content
GSWindTurkeyACM0002

Poyraz 54.9 MW Wind Farm Project, Turkey

GS-1008 ↗ · current registry ID: GS575

#1133of 1935 in Renewable energy#210of 295 in Turkey#866of 1801 in Gold Standard (GS)#884of 1287 in ACM0002

5.0/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

The Poyraz wind farm is a standard Gold Standard wind project with VVB-confirmed additionality and a reasonable pro-rata delivery of ~122% of the lifetime ex-ante expectation for the 2024 monitoring period. However, a Forward Action Request mandating an independent bird-migration study before first credit issuance, six corrective action requests, and a low extraction confidence across the document set materially weaken confidence in the project's environmental integrity and documentation quality.

Red Flags

  • Forward Action Request (GS Registration Review) requires an independent third-party study on bird migration routes and mitigation measures before the first credit issuance request — the project's environmental integrity is not yet fully cleared.
  • Six Corrective Action Requests (CAR-1 through CAR-6) were raised during verification, indicating recurring documentation or compliance gaps.
  • Total verified ERR for the 2024 monitoring period is not stated in the extracted record, preventing independent cross-check of the 176,846 tCO₂e claimed figure.
  • Baseline method is reported as 'project' in the verification report but 'jurisdictional' in the monitoring report — an unresolved contradiction that affects baseline credibility.
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and some facts may be incomplete.

Credit Vintages

IssuedRetiredAvailable
2023
76,131076,131
2024
100,7150100,715
Total176,8460176,846

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Avoidance project; no carbon reversals but bird-migration FAR open

Leakage

0% deemed negligible — appropriate for on-site wind

Baseline

Project-specific; method contradicted in monitoring report; reassessed 2024

Safeguards

FPIC and grievance mechanism present; bird-migration FAR and 6 CARs unresolved

Double-claim

CCP approved; CORSIA eligibility not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents