Project Reignite: Turning Farm Waste to Climate Action
Score Breakdown
Integrity
verified additionality confirmed by the VVB via an investment test (validation report, 2026)
missing no baseline method stated and leakage not addressed in monitoring report (monitoring report, 2024)
Transparency
verified monitoring period and verified vs claimed removals provided (monitoring report, 2024) with total removals verified = 115,103 tCO2e
inferred ✗ some standard baseline inputs (grid emission factor, buffer pool percentage) not stated in available documents
Claim Safety
missing CCP approval recorded (validation report, 2026) — increases risk of double-claiming
inferred ✓ CORSIA eligibility listed as false in the extracted record but contradictory evidence exists, reducing confidence
Documentation
verified 21 documents listed and named evidence docs include monitoring, validation, PDD and issuance; min extraction confidence is high
inferred ✗ contradictions between monitoring and validation documents on safeguards, grievance mechanism, FPIC and benefit sharing reduce reliability
Detailed Analysis
Integrity
Additionality is confirmed by the VVB using an investment test (validation report). Reversals are reported as 'none reported' and no material findings or corrective actions were listed in the monitoring report (2024-08-28). However, the project lacks a stated baseline method and has not documented leakage treatment or a buffer percentage (monitoring report and PDD extracts), which are material weaknesses for baseline validity and leakage risk. These gaps lower the integrity score.
Transparency
The monitoring report provides a clear monitoring period (2023-10-16 — 2024-06-30) and the total removals claimed equal the total removals verified (115,103 tCO2e), which supports transparency. The VVB name (RINA) and registry (VCS) are stated and many documents are available (n=21). However, important parameters (grid emission factor, buffer pool percentage, and some usage monitoring details) are not stated in the extracted record, reducing transparency.
Claim Safety
The project is recorded as CCP-approved in the validation report, which creates a higher risk of double-claiming; this is a material claim-safety concern. CORSIA eligibility is listed as false in the merged facts, but contradictions exist (see overall contradictions), so confidence is reduced. Lack of leakage treatment and absence of a baseline method also raise over-crediting risk.
Documentation
Documentation appears relatively complete: monitoring report (2024-08-28), PDD, validation report, issuance record and 21 documents in total are listed, and minimum extraction confidence is high. There are no material findings or corrective actions in the monitoring report. However, the record contains multiple contradictions between documents (monitoring vs validation), which reduces the effective reliability of the documentation.
Overall
I privileged the validation report when resolving contradictions where that document is more recent and typically more authoritative (validation report entries dated 2025–2026). Specifically: - For CORSIA eligibility I privileged the validation report statement of not CORSIA-eligible because the validation report is authoritative and dated 2025 (versus an unknown source dated 2026-03-10). - For CCP status I privileged the validation report value 'approved' (validation report, 2026) over a later unknown source stating 'eligible'. - For safeguards, grievance mechanism, benefit sharing and FPIC there is conflicting evidence: the monitoring report (2024) indicates these were present, while the validation report (2025) indicates they were absent. I privileged the validation report for these items because it is a later, dedicated conformity assessment and is generally higher priority; privileging the validation report reduces confidence in the monitoring-report claims. These contradictions — particularly between monitoring and validation documents — reduce the reliability of the record and were factored into lowering scores for integrity and claim safety. Overall score reflects confirmed additionality and complete documentation but is pulled down by missing baseline/leakage treatment and double-claiming risk.
Audit Analysis
Project shows some strengths: additionality was confirmed by the VVB and monitoring verified the claimed removals. However, key integrity gaps remain — no baseline method or leakage treatment is documented and CCP approval raises double-claim risk. Documentation is otherwise reasonably complete and recent.
Project Description
Project Reignite aims to address the environmental crisis caused by increasing agricultural waste biomass in India. Traditionally, farmers burn agricultural waste in fields or allow it to decompose, both practices contributing to greenhouse gas emissions and polluting air, water, and soil. This project offers a practical solution by empowering smallholder farmers to convert their agricultural waste into biochar through flame curtain pyrolysis in steel-shield soil pits. The process involves collecting and drying waste biomass, pyrolyzing it in a steel-shield soil pit, and then mixing the resulting biochar with manure for subsurface soil application. This prevents GHG emissions from burning and decomposition and sequesters carbon in the soil for potentially centuries. Beyond environmental benefits, the project contributes significantly to social and community well-being. By transforming waste into biochar, it enhances soil fertility, leading to increased agricultural yields and improved food security. It aims to uplift small and marginalized communities, including women, by improving community health through reduced air pollution and increasing income opportunities. The project actively engages local stakeholders through consultations and ongoing communication channels.
Red Flags
- Leakage not addressed in available documents
- No baseline method or reassessment documented
- Project is CCP-approved (double-claim risk)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 25,500 | 4,337 | 21,163 | |
| 2024 | 15,000 | 0 | 15,000 | |
| Total | 40,500 | 4,337 | 36,163 |
Cosa migliorerebbe questo punteggio
- Publish and cite the baseline method and any reassessment documentation (including grid emission factor inputs).
- Provide an explicit leakage assessment and any leakage deduction or justification; reconcile monitoring and validation records on safeguards, grievance mechanism, FPIC and benefit-sharing.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed
no buffer info
not addressed
method not stated
inconsistently documented
CCP-approved
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →