Skip to main content
CCEnergy industriesColombiaAMS-I.D

Proyecto agrupado HZ Energy

ECO-86 ↗

#627of 1935 in Renewable energy#22of 124 in Colombia#22of 99 in CerCarbono (CC)#214of 806 in AMS-I.D

5.6/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.5

Audit Analysis

The HZ Energy grouped renewable energy project in Colombia has VVB-verified additionality and a jurisdictional baseline, but is undermined by multiple material findings (calibration delays at La Rebusca, missing applicability conditions for future installations) and the absence of a stated buffer pool. The project delivered roughly 66% of its pro-rata lifetime expectation for the elapsed monitoring period, which is conservative but raises questions about baseline accuracy. Documentation is adequate in volume but carries medium extraction confidence and several unresolved contradictions across source documents.

Red Flags

  • Multiple material findings (SACs) regarding calibration delays for the La Rebusca main meter required retroactive adjustment of energy generation values, indicating measurement uncertainty in the verified ERR
  • Contradictions across documents on FPIC (validation report says conducted; PDD says not conducted), safeguards (validation report says mentioned; issuance says not), and benefit sharing (validation report says not described; PDD says described) create uncertainty about the project's social compliance record
  • Baseline method is contradictory within the same validation report (jurisdictional vs. project-specific), weakening confidence in the baseline's robustness

Credit Vintages

IssuedRetiredAvailable
2016
1,80901,809
2017
1,95101,951
2018
2,7762,414362
2019
4,4244,4240
2020
5,6865,6860
Total16,64612,5244,122

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low inherent reversal risk

Leakage

Negligible with justification; appropriate for RE

Baseline

Jurisdictional but contradicted in same doc; no reassessment date

Safeguards

FPIC and grievance present but contradicted across docs

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents