Skip to main content
CCEnergy industriesColombiaACM0002

Proyecto Hidroeléctrico El Quimbo

ECO-34 ↗

#9of 124 in Colombia#8of 99 in CerCarbono (CC)#238of 1287 in ACM0002

6.1/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
5.5
Documentation
6.5

Audit Analysis

El Quimbo is a well-established hydroelectric project in Colombia using the standard ACM0002 methodology, with additionality confirmed by TÜV SÜD and a reasonable 0% leakage deduction for a grid-displacement project. However, multiple contradictions in ERR figures, ex-ante lifetime estimates, and crediting periods across documents raise data-reliability concerns, and the absence of a stated buffer pool or baseline reassessment date leaves gaps in permanence and baseline robustness. The project is fundamentally sound but its documentation consistency needs improvement.

Red Flags

  • Ex-ante lifetime ERR differs by ~24% between the PDD (14.17 MtCO₂) and the monitoring report (10.82 MtCO₂), creating uncertainty about the true baseline credit volume
  • Crediting period stated as 2015–2035 in the verification report but 2020–2040 in the validation report, a 5-year shift that affects pro-rata calculations
  • Total ERR claimed in the verification report (1,278,226 tCO₂) exceeds the verified/issued amount (966,404 tCO₂) by ~32%, indicating a material adjustment during verification that is not fully explained
  • Baseline method is recorded as both 'project' and 'jurisdictional' within the same verification report, an internal inconsistency that undermines baseline clarity

Credit Vintages

IssuedRetiredAvailable
2015
45,91845,9180
2016
401,096401,0960
2017
635,127635,1270
2018
550,571550,5710
2019
648,890648,8900
2020
251,420251,4200
2021
186,014100185,914
2022
102,3050102,305
2023
613,3880613,388
2024
250,7110250,711
Total3,685,4402,533,1221,152,318

Risk Indicators

Additionality

VVB-confirmed (TÜV SÜD)

Permanence

Avoidance project, N/A for reversal

Leakage

0% deduction, quantified justification

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance mechanism, social programs

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents