Proyecto Hidroeléctrico El Quimbo
#9of 124 in Colombia#8of 99 in CerCarbono (CC)#238of 1287 in ACM0002
Audit Analysis
El Quimbo is a well-established hydroelectric project in Colombia using the standard ACM0002 methodology, with additionality confirmed by TÜV SÜD and a reasonable 0% leakage deduction for a grid-displacement project. However, multiple contradictions in ERR figures, ex-ante lifetime estimates, and crediting periods across documents raise data-reliability concerns, and the absence of a stated buffer pool or baseline reassessment date leaves gaps in permanence and baseline robustness. The project is fundamentally sound but its documentation consistency needs improvement.
Red Flags
- Ex-ante lifetime ERR differs by ~24% between the PDD (14.17 MtCO₂) and the monitoring report (10.82 MtCO₂), creating uncertainty about the true baseline credit volume
- Crediting period stated as 2015–2035 in the verification report but 2020–2040 in the validation report, a 5-year shift that affects pro-rata calculations
- Total ERR claimed in the verification report (1,278,226 tCO₂) exceeds the verified/issued amount (966,404 tCO₂) by ~32%, indicating a material adjustment during verification that is not fully explained
- Baseline method is recorded as both 'project' and 'jurisdictional' within the same verification report, an internal inconsistency that undermines baseline clarity
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 45,918 | 45,918 | 0 | |
| 2016 | 401,096 | 401,096 | 0 | |
| 2017 | 635,127 | 635,127 | 0 | |
| 2018 | 550,571 | 550,571 | 0 | |
| 2019 | 648,890 | 648,890 | 0 | |
| 2020 | 251,420 | 251,420 | 0 | |
| 2021 | 186,014 | 100 | 185,914 | |
| 2022 | 102,305 | 0 | 102,305 | |
| 2023 | 613,388 | 0 | 613,388 | |
| 2024 | 250,711 | 0 | 250,711 | |
| Total | 3,685,440 | 2,533,122 | 1,152,318 |
Risk Indicators
VVB-confirmed (TÜV SÜD)
Avoidance project, N/A for reversal
0% deduction, quantified justification
Project-specific, no reassessment date
FPIC, grievance mechanism, social programs
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →