Proyecto Hidroeléctrico Guavio Menor
#15of 124 in Colombia#16of 99 in CerCarbono (CC)#181of 806 in AMS-I.D
Audit Analysis
A grid-connected hydroelectric project in Colombia with VVB-verified additionality and a jurisdictional baseline, delivering 213% of its pro-rata ex-ante expectation for the monitoring period. However, six material findings—including calibration gaps for the retroactivity period, an undocumented legal entity name change, and an internal contradiction in the leakage justification—along with a 0% buffer pool and multiple cross-document contradictions, temper an otherwise sound project design.
Red Flags
- Calibration certificates for electricity meters did not cover the full retroactivity period (2016–2020), undermining MRV integrity for the earliest crediting years
- Legal entity name change from EMGESA to Enel Colombia lacks supporting documentation, raising ownership and accountability questions
- Internal contradiction within the verification report: leakage justification is simultaneously described as 'deemed negligible' and 'quantified'
- 0% buffer pool with no permanence risk mitigation mechanism, despite reversal events being marked as 'not addressed'
- Crediting period differs between the verification report (2016–2036) and the validation report (2018–2038), creating ambiguity about the valid crediting window
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 10,224 | 10,224 | 0 | |
| 2017 | 16,065 | 16,065 | 0 | |
| 2018 | 13,083 | 13,083 | 0 | |
| 2019 | 7,701 | 7,701 | 0 | |
| 2020 | 6,611 | 6,611 | 0 | |
| 2021 | 5,372 | 0 | 5,372 | |
| 2022 | 3,957 | 0 | 3,957 | |
| 2023 | 19,183 | 0 | 19,183 | |
| 2024 | 10,396 | 0 | 10,396 | |
| Total | 92,592 | 53,684 | 38,908 |
Risk Indicators
VVB-verified combined test
mixed evidence / unresolved risk
0% deduction, internal contradiction in justification
Jurisdictional per verification, contradicted by validation; no reassessment date
FPIC, grievance mechanism, benefit sharing, social projects documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →