CCEnergy industriesColombiaACM0002

Proyecto Hidroeléctrico Tequendama 1, 2, 3 y 4

ECO-38 ↗

#7of 124 in Colombia#7of 99 in CerCarbono (CC)#168of 1287 in ACM0002

6.3/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.5
Documentation
6.0

Audit Analysis

A Colombian hydroelectric project (Tequendama 1-4) displacing grid electricity, verified by TÜV SÜD under the CerCarbono national registry. Additionality is VVB-confirmed and the project type (avoidance via grid displacement) carries no permanence risk, but the baseline method is inconsistently described across documents and several key parameters (FNRB, usage rates, CORSIA/CCP status) are not stated. The verified ERR of ~73,409 tCO2e for the 1.67-year monitoring period represents roughly 88% of the pro-rata lifetime expectation, which is reasonable given hydrological variability.

Red Flags

  • Baseline method is described as 'project-specific' in the verification report but 'jurisdictional' in the monitoring report — an unresolved inconsistency that affects baseline credibility
  • Baseline last reassessment date is not stated in any available document, making it impossible to confirm the baseline remains current
  • Six contradictions identified across documents, including a units discrepancy in ERR figures (73.409 vs 73,409) and conflicting leakage justifications ('quantified' vs 'deemed negligible') within the same verification report at different dates
  • CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2018
77,72577,7250
2019
51,71551,7150
2020
36,63636,6360
2021
17,652017,652
2022
18,237018,237
2023
50,699050,699
2024
4,47304,473
Total257,137166,07691,061

Risk Indicators

Additionality

VVB-confirmed (TÜV SÜD)

Permanence

Avoidance project – no reversal risk

Leakage

0% quantified – appropriate for grid displacement

Baseline

Project-specific; method contradicts across docs; reassessment date not stated

Safeguards

FPIC conducted; grievance mechanism present

Double-claim

CORSIA and CCP status not stated – dual-channel risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents