Prymorska Wind Farm
#391of 1935 in Renewable energy#2of 8 in UA#9of 154 in Intl. Carbon Registry (ICR)#296of 1287 in ACM0002
Audit Analysis
The Prymorska Wind Farm is a fundamentally sound renewable-energy avoidance project with a jurisdictional baseline, VVB-confirmed additionality, and a conservative delivery rate (~94% of pro-rata expectation). However, 18 material findings, 3 outstanding corrective actions, and several unaddressed transparency fields (CORSIA, CCP, FNRB) temper confidence. The project is operationally credible but documentation and safeguards compliance remain incomplete.
Red Flags
- Safeguards section status is listed as 'Open' in the verification report, and the ICR Tool for Environmental and Socioeconomic Safeguards has not been completed (corrective action)
- Project type identification inconsistency flagged between CDR and avoidance/reduction categories across documents
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- 18 material findings in the verification report, including missing commissioning data for turbine No. 56 and absence of a materiality threshold in the VVR
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 189,588 | 0 | 189,588 | |
| 2020 | 226,143 | 0 | 226,143 | |
| 2021 | 226,143 | 0 | 226,143 | |
| 2022 | 226,143 | 0 | 226,143 | |
| 2023 | 226,143 | 0 | 226,143 | |
| 2024 | 226,143 | 0 | 226,143 | |
| 2025 | 226,143 | 0 | 226,143 | |
| 2026 | 226,143 | 0 | 226,143 | |
| 2027 | 226,143 | 0 | 226,143 | |
| 2028 | 226,143 | 0 | 226,143 | |
| 2029 | 36,554 | 0 | 36,554 | |
| Total | 2,261,429 | 0 | 2,261,429 |
Risk Indicators
Combined test, VVB-confirmed
Wind farm – no reversal risk
0% – negligible for wind
Jurisdictional grid EF (2022)
Section open; tool incomplete
CORSIA/CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →