Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredAMS-I.D

Rajwakti Small Scale Hydropower Project

VCS-604 ↗

#982of 1935 in Renewable energy#491of 975 in India#617of 1339 in Verra (VCS)#316of 806 in AMS-I.D

5.2/ 10
Integrity
5.0
Transparency
5.5
Claim Safety
6.0
Documentation
4.0

Audit Analysis

The Rajwakti small-scale hydropower project has a confirmed additionality assessment and a jurisdictional grid-emission-factor baseline, but suffers from a non-permanence risk analysis that lists 'NA' for every risk field, no stated buffer pool, and eleven corrective actions raised by the VVB. Multiple contradictions between the verification report, monitoring report, and validation report — including a disputed crediting period and a grid-emission-factor decimal error — undermine confidence in the data record. The project is a grid-connected renewable with inherently low reversal risk, but the documentation gaps and data inconsistencies prevent a higher rating.

Red Flags

  • Non-permanence risk analysis (Section 4.6) lists 'NA' for every risk field, meaning no assessment of dam failure, drought, or sedimentation risk was performed for this hydropower project.
  • Eleven corrective actions were required by TÜV SÜD, including missing meter calibration certificates, missing JMRs for four months, and inconsistent emission-reduction values between the monitoring report and the ER sheet.
  • Two verification reports disagree on the crediting period: one states 2006-04-01 to 2016-03-31, the other 2019-11-13 to 2026-11-12, creating ambiguity about which period the 70,035 tCO2e covers.
  • The monitoring report (2009) records a grid emission factor of 0.0080317, which is a factor-of-100 decimal error relative to the 0.80317 tCO2/kWh confirmed in the verification report.

Credit Vintages

IssuedRetiredAvailable
2006
57,38856,920468
Total57,38856,920468

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

mixed evidence / unresolved risk

Leakage

0% with negligible justification

Baseline

Jurisdictional but 2005 EF, doc conflict

Safeguards

FPIC & grievance in later docs only

Double-claim

CORSIA & CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS I.D. Grid Connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents