Skip to main content
ICRAvoidance / ReductionTRACM0002

Ral Enerji G-4 Viranşehir-9-SPP

ICR-344 ↗

#523of 1935 in Renewable energy#6of 75 in TR#11of 154 in Intl. Carbon Registry (ICR)#395of 1287 in ACM0002

5.8/ 10
Integrity
6.5
Transparency
5.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A newly validated grid-connected renewable energy project in Turkey (ACM0002, 5-year crediting period starting March 2025) with a jurisdictional baseline and combined additionality test. The project is in its earliest phase with no monitoring data yet available, and several key verification details (VVB-confirmed additionality, buffer pool, FNRB) are not stated in the extracted record. No material findings, contradictions, or reversal events were reported.

Red Flags

  • Additionality test type is stated as 'combined' in the validation report, but explicit VVB confirmation of the additionality assessment is not captured in the extracted record
  • No monitoring report or verified ERR figures are available; all claim verification is limited to the ex-ante estimate of 317,250 tCO2e over the full crediting period

Credit Vintages

IssuedRetiredAvailable
2025
53,194053,194
2026
63,450063,450
2027
63,450063,450
2028
63,450063,450
2029
63,450063,450
2030
10,256010,256
Total317,2500317,250

Risk Indicators

Additionality

Combined test stated; VVB confirmation not explicitly captured

Permanence

Avoidance project; no reversal risk or events reported

Leakage

0% deduction; negligible for grid-connected renewable

Baseline

Jurisdictional grid EF; last reassessment date not stated

Safeguards

FPIC and benefit sharing documented; grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents