Recyling Used Cooking Oil into Biodiesel in Bali
GS-229 ↗ · current registry ID: GS1374
#194of 352 in Biomass#24of 33 in Indonesia#1412of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard biodiesel project in Bali that recycles used cooking oil, with verified emissions reductions matching its claimed figure for the first monitoring period. However, the project delivered only about 34% of its pro-rata lifetime expectation for the elapsed period, the verification process surfaced seven material findings and ten corrective actions, and several key transparency fields (VVB identity, FNRB method, usage monitoring) are absent from the extracted record.
Red Flags
- Verified ERR of 698 t for the 2.4-year monitoring period represents only ~34% of the pro-rata lifetime expectation (~2,036 t), indicating significant under-delivery relative to the ex-ante estimate of 8,423 t over 10 years.
- Ten corrective actions were required by the verification body, including evidence gaps on byproduct glycerol fate, NCVBD monitoring frequency, fuel consumption parameters, and employment quality improvement.
- The verification body's name is not stated in the extracted record, making it impossible to confirm VVB independence or accreditation.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 394 | 394 | 0 | |
| 2015 | 287 | 287 | 0 | |
| 2016 | 17 | 17 | 0 | |
| Total | 698 | 698 | 0 |
Risk Indicators
Combined test present but VVB confirmation not stated
no reversal events but feedstock variability unaddressed
Described as quantified but no specific deduction percentage stated
Project-specific baseline; no reassessment date found
Safeguards and grievance mechanism mentioned; FPIC not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →