Red Sea Power Wind Farm
#159of 1935 in Renewable energy#62of 1339 in Verra (VCS)#115of 1287 in ACM0002
Audit Analysis
The Red Sea Power Wind Farm is a straightforward renewable-energy project under VCS methodology ACM0002 with a jurisdictional (grid-based) baseline, a VVB-confirmed combined additionality test, and no permanence or reversal risk. The verified emissions reductions for the 18-month monitoring period (135,927 tCO₂) match the claimed figure exactly, indicating no over-crediting. However, eight contradictions across documents, several unstated eligibility statuses (CORSIA, CCP), and a shifting leakage justification between monitoring periods introduce moderate data-reliability concerns.
Red Flags
- Eight contradictions between documents, including conflicting baseline method (jurisdictional vs. project-specific), additionality test type (combined vs. first-of-its-kind), and crediting period start dates, reducing confidence in the extracted record.
- Leakage justification changed from 'quantified' in the December 2024 monitoring report to 'deemed negligible' in the September 2025 monitoring report, with the deduction remaining at 0% in both cases.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel and market-eligibility risk unassessed.
- A total ERR figure of 1,118,169 tCO₂ appears in an undated, unidentified source, conflicting with the 135,927 tCO₂ in the validation report; the provenance of the higher figure is unclear.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Energy project, no reversal risk
0% deduction, justification inconsistent
Jurisdictional, method contradicted in docs
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →