Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Djibouti Registry: RegisteredACM0002

Red Sea Power Wind Farm

VCS-3163 ↗

#159of 1935 in Renewable energy#62of 1339 in Verra (VCS)#115of 1287 in ACM0002

6.5/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
6.5
Documentation
6.5

Audit Analysis

The Red Sea Power Wind Farm is a straightforward renewable-energy project under VCS methodology ACM0002 with a jurisdictional (grid-based) baseline, a VVB-confirmed combined additionality test, and no permanence or reversal risk. The verified emissions reductions for the 18-month monitoring period (135,927 tCO₂) match the claimed figure exactly, indicating no over-crediting. However, eight contradictions across documents, several unstated eligibility statuses (CORSIA, CCP), and a shifting leakage justification between monitoring periods introduce moderate data-reliability concerns.

Red Flags

  • Eight contradictions between documents, including conflicting baseline method (jurisdictional vs. project-specific), additionality test type (combined vs. first-of-its-kind), and crediting period start dates, reducing confidence in the extracted record.
  • Leakage justification changed from 'quantified' in the December 2024 monitoring report to 'deemed negligible' in the September 2025 monitoring report, with the deduction remaining at 0% in both cases.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel and market-eligibility risk unassessed.
  • A total ERR figure of 1,118,169 tCO₂ appears in an undated, unidentified source, conflicting with the 135,927 tCO₂ in the validation report; the provenance of the higher figure is unclear.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Energy project, no reversal risk

Leakage

0% deduction, justification inconsistent

Baseline

Jurisdictional, method contradicted in docs

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents