Redstone CSP project
#8of 59 in South Africa#284of 1339 in Verra (VCS)#396of 1287 in ACM0002
Audit Analysis
The Redstone CSP project is a concentrated solar power facility in South Africa displacing a high-carbon grid (0.96 tCO₂/MWh), with a solid combined additionality test confirmed by the VVB and a jurisdictional baseline. However, a legal ownership dispute over environmental attributes, unresolved meter-calibration issues, and four contradictions between the PDD and validation report introduce moderate risk. The project is at the validation stage with no monitoring data yet available to confirm actual delivery.
Red Flags
- Dispute regarding ownership of environmental attributes and IPP Office consent requirements identified in the validation report, with a Forward Action Request carried into subsequent verifications
- Four contradictions between the PDD (2024) and the validation report (2026) on benefit sharing, baseline method, leakage justification, and crediting period dates
- Monitoring period is not stated in any available document, preventing any comparison of claimed versus verified emissions reductions
- Nine corrective actions remain open, including meter calibration frequency, project boundary completeness, and legal review of credit ownership
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
CSP generation, no reversal risk
0% deemed negligible, justified
Jurisdictional per VR, contradicted by PDD
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →