Reducing Gas Leakages within North West and other sub-areas of the Titas Gas Distribution Network in Bangladesh
#19of 189 in Methane#16of 121 in Bangladesh#285of 1339 in Verra (VCS)
Audit Analysis
A VCS gas-leakage reduction project in Bangladesh with a solid VVB-verified additionality assessment and a measured project-specific baseline, but significant gaps in safeguards documentation, leakage justification, and permanence provisions. The most recent verification report (December 2025) raises concerns about unaddressed leakage, absent grievance mechanisms, and no FPIC, while also flagging data-quality issues in monitoring equipment. The project is not CORSIA-eligible, reducing dual-channel risk, but the absence of a buffer pool and a lifetime ex-ante ERR figure limits confidence in long-term claim integrity.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the most recent verification report (Dec 2025), despite the earlier report (May 2024) stating it was 'deemed negligible' — the justification has regressed
- No FPIC conducted, no grievance mechanism in place, and safeguards not mentioned in the most recent verification report — a significant social-compliance gap for a VCS project
- 8 Corrective Action Requests raised during verification, including unclarified waste management from leak-repair activities and a discrepancy in cumulative SDG contribution values
- Corrupted Hi-Flow Sampler records and date-formatting errors required manual correction, indicating data-quality vulnerabilities in the MRV chain
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 310,380 | 0 | 310,380 | |
| 2023 | 665,515 | 15,623 | 649,892 | |
| Total | 975,895 | 15,623 | 960,272 |
Risk Indicators
VVB-verified combined test; capture not legally required
mixed evidence / unresolved risk
0% deduction; justification 'not addressed' in most recent report
Project-specific measured baseline; no reassessment date stated
No FPIC, no grievance mechanism, safeguards not mentioned
Not CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →