Skip to main content
VCSAgriculture Forestry and Other Land UseBrazil Registry: RegisteredAR-ACM0003

ReforesTerra Grouped Project

VCS-3166 ↗

#160of 261 in Soil carbon#143of 211 in Brazil#1049of 1339 in Verra (VCS)#64of 97 in AR-ACM0003

4.4/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.3
Documentation
4.0

Audit Analysis

The ReforesTerra Grouped Project is a 30-year Brazilian soil-carbon afforestation project (AR-ACM0003 v2.0) that passed validation in May 2025 after resolving 13 corrective action requests and 7 clarification requests. However, the validation report reveals significant weaknesses: a 0% leakage deduction that the audit team found was not properly demonstrated per methodology provisions, FPIC not conducted per the final report, and a project-specific baseline with unresolved questions about mining concessions and native ecosystem clearance. The project is in its earliest stage with no monitoring data yet available.

Red Flags

  • Leakage deduction of 0% was justified as 'deemed negligible,' yet the validation report explicitly notes that methodology provisions (AR-TOOL15) were not followed to demonstrate zero leakage from grazing displacement — a material finding that undermines the credibility of the zero-leakage claim.
  • FPIC was not conducted according to the final validation report (2025-05-26), contradicting an earlier version of the same report (2025-03-10) that indicated it had been done. This is a fundamental safeguard gap for a project operating on community land in Brazil.
  • The Non-Permanence Risk Report (NPRR) was flagged as having unclear justification and verification, and reversal events are described as 'not addressed' in the most recent document, leaving the 10% buffer pool's adequacy unconfirmed.
  • Insufficient evidence was provided to demonstrate that the project area was not cleared of native ecosystems, raising questions about the eligibility of the afforestation activity under AR-ACM0003.
  • Low extraction confidence across the document set means key data points (FNRB, monitoring methods, usage rates) could not be reliably extracted, limiting the depth of assessment.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

10% buffer pool, but NPRR unclear and reversals 'not addressed'

Leakage

0% deduction; methodology not followed per audit finding

Baseline

Project-specific; mining & native ecosystem issues flagged

Safeguards

Grievance mechanism present; FPIC not conducted per final report

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AR-ACM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents