Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Turkey Registry: RegisteredACM0002

Reis Enerji Grouped HEPP Project

VCS-1500 ↗

#61of 295 in Turkey#132of 1339 in Verra (VCS)#205of 1287 in ACM0002

6.2/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.5
Documentation
5.5

Audit Analysis

The Reis Enerji Grouped HEPP is a small-scale hydropower project under VCS with a jurisdictional baseline and VVB-confirmed investment additionality test, giving it a solid structural foundation. However, the verification report contains multiple internal contradictions (FPIC status, leakage justification, benefit-sharing description) and six corrective action requests, and several key MRV parameters (FNRB method, buffer pool percentage, usage monitoring) are not stated in the extracted record. The project under-delivered relative to its ex-ante estimate in a prior period due to low rainfall, which is a positive signal for claim conservatism.

Red Flags

  • FPIC status is contradictory within the same 2024 verification report — one section states it was conducted, another states it was not; treated as not conducted (conservative)
  • Leakage justification is contradictory within the 2024 report: one passage says 'deemed negligible' while another says 'quantified', yet the deduction is 0% with no quantified figure provided
  • Grid emission factor is from 2013 and no updated value or reassessment date is provided in the extracted record
  • Six corrective action requests (CARs) were raised in the 2024 verification, including missing net generation values, template compliance gaps, and unit/frequency discrepancies between the PDD and monitoring report

Credit Vintages

IssuedRetiredAvailable
2016
2,5632,5630
2017
8,9688,9680
2018
11,63811,6380
2019
15,21215,2120
2020
14,64014,6400
2021
12,053012,053
2022
13,5761,17212,404
2023
14,858014,858
2024
9,17709,177
Total102,68554,19348,492

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, thin justification, internal contradiction

Baseline

Jurisdictional baseline, ACM0002

Safeguards

Grievance mechanism present, FPIC status contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents