Renewable Electricity Grouped Project in Africa
#8of 19 in Tanzania#877of 1339 in Verra (VCS)#411of 806 in AMS-I.D
Audit Analysis
A small-scale hydropower project under VCS AMS-I.D. with a VVB-confirmed combined additionality test and reasonable leakage treatment, but the validation report surfaced ten material findings (seven requiring corrective action) covering data consistency, eligibility criteria, and meter calibration. No monitoring reports or verified emission reductions were found in the available record, leaving the 71,456 tCO₂e lifetime claim entirely unverified. A contradiction between the validation report and PDD on baseline method (project-specific vs. jurisdictional) adds uncertainty to the baseline construction.
Red Flags
- Ten material findings in the validation report, including seven corrective actions covering eligibility criteria, data consistency (head/flowrate values), emission factor currency, and meter calibration details
- No monitoring reports or verified emission reductions found in the available record — the 71,456 tCO₂e lifetime claim is entirely unverified
- Contradiction between validation report (project-specific baseline) and PDD (jurisdictional baseline) on baseline method
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Renewable electricity – no reversal risk
0% deemed negligible – reasonable
Contradiction on method; EF data flagged
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →