Renewable Energy Programme in Dominican Republic
#392of 1935 in Renewable energy#1of 6 in Dominican Republic#10of 99 in CerCarbono (CC)#297of 1287 in ACM0002
Audit Analysis
A solar photovoltaic project in the Dominican Republic displacing grid electricity, verified by AENOR Confía S.A.U under the CerCarbono standard. Additionality is confirmed via an investment test and the jurisdictional (grid) baseline is appropriate for the technology, but several inter-document contradictions—particularly around FPIC status, the crediting period length, and the leakage justification—introduce moderate uncertainty. All corrective actions from the verification process were resolved, and the project presents no reversal risk given its nature as an avoidance-type renewable energy installation.
Red Flags
- FPIC status is contradictory: the verification report (2025) states FPIC was not conducted, while the monitoring report (2024) indicates it was; the more recent verification report is privileged, leaving a gap in community engagement documentation
- Crediting period differs between the validation report (10 years, 2024–2034) and the verification report (30 years, 2023–2053); the 30-year period is standard for ACM0002 but the discrepancy suggests the validation may have been superseded without full traceability
- The verification report contains an internal contradiction on leakage justification (described as both 'deemed negligible' and 'quantified' in the same document), weakening confidence in the 0% leakage deduction
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 26,742 | 0 | 26,742 | |
| 2024 | 53,385 | 0 | 53,385 | |
| Total | 80,127 | 0 | 80,127 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, internal doc contradiction
Jurisdictional grid baseline, 2022 EF
Grievance mechanism present, FPIC contradictory
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →