Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredACM0002

Renewable Power Project by SEI Kathiravan Power Private Limited

VCS-1789 ↗

#308of 975 in India#364of 1339 in Verra (VCS)#486of 1287 in ACM0002

5.6/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A VCS renewable energy project (ACM0002) with a VVB-verified investment additionality test and no material findings, but undermined by a project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' and eight corrective actions flagging systematic gaps in monitoring documentation. The ERR figures are internally consistent in the final verification (claimed equals verified at 183,078 tCO₂e), yet multiple contradictions between the monitoring and verification reports erode confidence in the underlying data trail.

Red Flags

  • Eight corrective actions in the verification report, including a missing commissioning certificate, an incorrect metering diagram, an incorrect emission reduction sheet, and a wrong monitoring period stated in the MR — indicating systematic MRV documentation weaknesses.
  • Baseline method is recorded as 'project' in the verification report but 'jurisdictional' in the monitoring report; the project-specific baseline is the weaker of the two and raises over-crediting risk.
  • Grid emission factor of 0.9475 tCO₂/MWh is drawn from 2018 data; if India's grid has decarbonised since then, the displacement benefit per MWh may be overstated.
  • No buffer pool percentage is stated in any available document, leaving permanence risk unquantified even though the project type (renewable generation) carries low inherent reversal risk.

Credit Vintages

IssuedRetiredAvailable
2017
64,10064,1000
2018
93,82370,89422,929
2019
94,086094,086
2020
90,232090,232
2021
89,049089,049
2022
94,029094,029
Total525,319134,994390,325

Risk Indicators

Additionality

VVB-verified investment test

Permanence

low inherent risk for renewable generation

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific baseline; 2018 grid EF

Safeguards

FPIC, grievance mechanism, benefit sharing confirmed

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents