Reunidas Ceramic Switching Non-Renewable Biomass Project

VCS-65 ↗

#109of 352 in Biomass#101of 211 in Brazil#732of 1339 in Verra (VCS)#31of 60 in AMS-I.E

5.0/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The Reunidas Ceramic project is a VCS-registered biomass energy-switching project in Brazil with VVB-confirmed additionality and a quantified 5% leakage deduction, but it is undermined by a project-specific baseline, the absence of FPIC, a new kiln installed after validation, and 19 corrective action requests that reveal significant data-quality and operational weaknesses. The verified ERR matches the claimed figure for the current monitoring period, yet multiple calculation inconsistencies and a reliance on invoices rather than direct measurement for biomass quantities raise over-crediting concerns.

Red Flags

  • 19 Corrective Action Requests raised during verification, spanning GHG calculation errors, methodology mis-citations, and SOCIALCARBON indicator corrections, indicating systemic data-quality problems
  • Qrenbiomass (renewable biomass quantity) is monitored via receipts and invoices rather than direct measurement, weakening the MRV chain
  • A new round kiln and new biomass burners were installed after validation, constituting a scope change that may not be fully reflected in the baseline
  • FPIC was not conducted and the project does not appropriately contemplate stakeholder participation, per the verification report
  • No structured environmental management system is implemented and kiln chimney emissions are not monitored

Credit Vintages

IssuedRetiredAvailable
2007
2,1642,1640
2008
8,5528,5520
2009
8,2038,2030
2010
9,3917,9011,490
2011
9,8544,9274,927
2012
8,5561,2107,346
2013
8,63908,639
2014
8,46808,468
2015
7,32207,322
2016
6,59806,598
2017
3,08103,081
2019
2,5742,5740
2022
1,8121,8120
2023
1,7511,7510
Total86,96539,09447,871

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Energy project – non-permanence N/A

Leakage

5% quantified deduction applied

Baseline

Project-specific, reassessed 2019

Safeguards

Grievance present; FPIC not conducted

Double-claim

CORSIA excluded; CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-I.E.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents